SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaNovato
CA-981508

Hamilton Landing Parking

7 Hamilton Landing, Novato, CA, 94949

Hamilton Landing Parking is a parking lot in Novato, CA with 2 Level 2 charging ports, not on a charging network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Pricing: $0.26 per kWh. 24 hours Sat-Sun. Public access. Listing data from NREL, last confirmed May 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🅿️Parking lot
📅Open since 2015
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
2
ports
Hours
24/7
24 hours Sat-Sun
Pricing
$0.26 per kWh
$0.26 per kWh

Stations & ports

1 station · 2 ports
Hamilton Landing Parking · L2 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1AJ1772
1BJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

7 Hamilton Landing · Novato, CA · 94949

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Hamilton Landing Parking located?
Hamilton Landing Parking is located at 7 Hamilton Landing, Novato, CA.
What kind of charging does Hamilton Landing Parking offer?
Hamilton Landing Parking offers Level 2 (AC) charging. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Hamilton Landing Parking?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at Hamilton Landing Parking. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Hamilton Landing Parking?
$0.26 per kWh
What are Hamilton Landing Parking's charging hours?
24 hours Sat-Sun
Can anyone use the chargers at Hamilton Landing Parking?
Yes — Hamilton Landing Parking is a publicly accessible charging location.
Is the Hamilton Landing Parking listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
—
no port data

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Every EV registered in California is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in Novato

See all →

EVROADWAY VO #7

Novato, CA

DC FastChargePoint
2 stations · 2 ports160 kW

SUTTER NOVATO STATION # 1 ADA

Novato, CA

Level 2ChargePoint
2 stations · 2 ports12 kW

EVROADWAY VO #2

Novato, CA

DC FastChargePoint
2 stations · 2 ports62.5 kW

Novato Fire Protection District

Novato, CA

Level 2AmpUp
1 station · 3 ports
Details
Hours
24 hours Sat-Sun
Pricing
$0.26 per kWh
Phone
415-884-9977
Network
Non-networked
Access
Public access
Ownership
Privately owned
From NREL

Verified by NREL · 17 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id70873
zip94949
cityNovato
plus4—
stateCA
ng_psi—
cng_psi—
countryUS
latitude38.059185
bd_blends—
longitude-122.514276
open_date2015-08-01
rd_blends—
ev_networkNon-Networked
ev_pricing$0.26 per kWh
updated_at2026-02-02T23:16:24Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameHamilton Landing Parking
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typePARKING_LOT
nps_unit_name—
station_phone415-884-9977
cards_accepted—
ev_dc_fast_num—
ev_network_web—
fuel_type_codeELEC
geocode_status200-9
hy_status_link—
street_address7 Hamilton Landing
funding_sources—
owner_type_codeP
access_days_time24 hours Sat-Sun
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2025-05-12
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging