SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaMarina
CA-979060

Central Coast Field Office -1

940 2nd Ave, Marina, CA, 93933

Central Coast Field Office -1 is a fed gov in Marina, CA with 2 Level 2 charging ports, not on a charging network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. By appointment. Listing data from NREL, last confirmed December 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Fed gov
📅Open since 2025
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
2
ports
Hours
—
Pricing
—

Stations & ports

1 station · 2 ports
Central Coast Field Office -1 · L2 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1AJ1772
1BJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

940 2nd Ave · Marina, CA · 93933

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Central Coast Field Office -1 located?
Central Coast Field Office -1 is located at 940 2nd Ave, Marina, CA.
What kind of charging does Central Coast Field Office -1 offer?
Central Coast Field Office -1 offers Level 2 (AC) charging. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Central Coast Field Office -1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at Central Coast Field Office -1. Actual times vary with vehicle, temperature, and station load.
Can anyone use the chargers at Central Coast Field Office -1?
Central Coast Field Office -1 is listed as by appointment access (Government use only) — check the details before visiting. NREL lists it as workplace charging, mainly for employees.
Is the Central Coast Field Office -1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
32.4
61,051 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 61,051 publicly-listed ports in California (35,123 Level 2 and 25,765 DC fast), that works out to roughly 32.4 EVs per public port and 59.5 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in Marina

See all →

MRYSH HOME2 STATION 1

Marina, CA

Level 2ChargePoint
1 station · 1 port9.6 kW

THE DUNES G-BAY FED CU

Marina, CA

Level 2ChargePoint
1 station · 2 ports7.7 kW

THE DUNES THE DUNES #6

Marina, CA

Level 2ChargePoint
1 station · 2 ports11.5 kW

THE DUNES THE DUNES #7

Marina, CA

Level 2ChargePoint
1 station · 2 ports9.6 kW

Plan a trip around here

This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.

Monterey & Big Sur →All California destinations →
Details
Network
Non-networked
Access
By appointment · Government use only
Workplace charging, mainly for employees · From NREL
Ownership
Federal government
From NREL

Verified by NREL · 9 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id445510
zip93933
cityMarina
plus4—
stateCA
ng_psi—
cng_psi—
countryUS
latitude36.6684
bd_blends—
longitude-121.80833
open_date2025-08-05
rd_blends—
ev_networkNon-Networked
ev_pricing—
updated_at2026-02-02T23:16:24Z
access_codeprivate
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameCentral Coast Field Office -1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeFED_GOV
nps_unit_name—
station_phone—
cards_accepted—
ev_dc_fast_num—
ev_network_web—
federal_agency
{
  "id": 16,
  "code": "DOI",
  "name": "Department of the Interior"
}
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address940 2nd Ave
funding_sources—
owner_type_codeFG
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 1
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 1
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_access—
access_detail_codeGOVERNMENT
cng_fill_type_code—
ev_connector_typesNEMA1450
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2025-12-12
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingYes
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePrivate - Government only
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPrivé - Réservé au gouvernement
intersection_directions_fr—
SpotCharge · Owner-listed EV charging