SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaFresno
CA-967223

CITY OF FRESNO FIG GARDEN 1

4265 N Figarden Dr, Fresno, CA, 93722
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
1
port
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 1 port
CITY OF FRESNO FIG GARDEN 1 · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

4265 N Figarden Dr · Fresno, CA · 93722

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is CITY OF FRESNO FIG GARDEN 1 located?
CITY OF FRESNO FIG GARDEN 1 is located at 4265 N Figarden Dr, Fresno, CA.
What kind of charging does CITY OF FRESNO FIG GARDEN 1 offer?
CITY OF FRESNO FIG GARDEN 1 offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at CITY OF FRESNO FIG GARDEN 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at CITY OF FRESNO FIG GARDEN 1. Actual times vary with vehicle, temperature, and station load.
What are CITY OF FRESNO FIG GARDEN 1's charging hours?
Open 24 hours
What charging network operates CITY OF FRESNO FIG GARDEN 1?
CITY OF FRESNO FIG GARDEN 1 is part of the ChargePoint Network network. See more ChargePoint Network charging across CA on SpotCharge.
Can anyone use the chargers at CITY OF FRESNO FIG GARDEN 1?
Yes — CITY OF FRESNO FIG GARDEN 1 is a publicly accessible charging location.
Is the CITY OF FRESNO FIG GARDEN 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
36
55,049 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 55,049 publicly-listed ports in California (31,353 Level 2 and 23,573 DC fast), that works out to roughly 36 EVs per public port and 65.1 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in Fresno

See all →

THE ROW EV 1

Fresno, CA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

Ellis Enterprises

Fresno, CA

Level 2INTERTIE
1 station · 10 ports7.2 kW

Mallah Inc.

Fresno, CA

DC FastSYNERGEV
2 stations · 4 ports50 kW

Fresno Sequioa Hospital - CN72-07

Fresno, CA

Level 2Blink Network
1 station · 8 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging