SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaMenlo Park
CA-920679

Facebook Building 23

300 Constitution Drive, Menlo Park, CA, 94025

Facebook Building 23 is an EV charging location in Menlo Park, CA with 4 DC fast charging ports up to 44 kW on the ChargePoint network. By appointment. Listing data from OpenChargeMap, last refreshed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
44 kW
DC fast
Ports
4
ports
Hours
—
Pricing
—

Finding this location

  • For Valet parking use during working hours.

    Source · OpenChargeMap

Stations & ports

2 stations · 4 ports
Facebook Building 23 · CCS 44kW
ChargePoint
DC fast · 44 kW

44 kW adds roughly 100 miles in about an hour, depending on the car.

1ACCS· 44 kW
1BCCS· 44 kW
Facebook Building 23 · CHAdeMO 44kW
ChargePoint
DC fast · 44 kW

44 kW adds roughly 100 miles in about an hour, depending on the car.

2ACHAdeMO· 44 kW
2BCHAdeMO· 44 kW

Estimated charging time

DC fast charging · 44 kW
~1 h 20 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

300 Constitution Drive · Menlo Park, CA · 94025

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Facebook Building 23 located?
Facebook Building 23 is located at 300 Constitution Drive, Menlo Park, CA.
What kind of charging does Facebook Building 23 offer?
Facebook Building 23 offers DC fast charging, with stations rated up to 44 kW. There are 2 charging stations and 4 total ports at this location.
How long does it take to charge an EV at Facebook Building 23?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 20 min on 44 kW DC fast charging at Facebook Building 23. Actual times vary with vehicle, temperature, and station load.
What charging network operates Facebook Building 23?
Facebook Building 23 is part of the ChargePoint network. See more ChargePoint charging across CA on SpotCharge.
Can anyone use the chargers at Facebook Building 23?
Facebook Building 23 is listed as by appointment access — check the details before visiting.
Is the Facebook Building 23 listing owner-managed?
Not yet. This page was generated from open charging data (OpenChargeMap) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
32.4
61,055 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 61,055 publicly-listed ports in California (35,127 Level 2 and 25,765 DC fast), that works out to roughly 32.4 EVs per public port and 59.5 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More DC fast charging

DC fast charging in Menlo Park →DC fast charging in California →ChargePoint in California →

More charging in Menlo Park

See all →

RWSH STATION 10

Menlo Park, CA

Level 2ChargePoint
1 station · 2 ports6.5 kW

RWSH STATION 11

Menlo Park, CA

Level 2ChargePoint
1 station · 2 ports6.5 kW

THE QUAD 2460EVERCORENEW

Menlo Park, CA

Level 2ChargePoint
1 station · 2 ports6.5 kW

THE QUAD GOLDMAN SACHS

Menlo Park, CA

Level 2ChargePoint
1 station · 2 ports6.5 kW
Details
Network
ChargePoint ↗
Access
By appointment

Data from OpenChargeMap

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

OpenChargeMap15 fields▾

From OpenChargeMap · CC-BY-SA 4.0

ID71770
UUID59CD69BD-23E4-45A8-A2FF-793209C13C83
OperatorID5
AddressInfo
{
  "ID": 72116,
  "Town": "Menlo Park",
  "Title": "Facebook Building 23",
  "Latitude": 37.4810206531467,
  "Postcode": "94025",
  "CountryID": 2,
  "Longitude": -122.167835379901,
  "AddressLine1": "300 Constitution Drive",
  "DistanceUnit": 0,
  "StateOrProvince": "California"
}
Connections
[
  {
    "ID": 102804,
    "LevelID": 3,
    "PowerKW": 44,
    "Quantity": 2,
    "StatusTypeID": 0,
    "CurrentTypeID": 30,
    "ConnectionTypeID": 32
  },
  {
    "ID": 106550,
    "LevelID": 3,
    "PowerKW": 44,
    "Quantity": 2,
    "StatusTypeID": 0,
    "CurrentTypeID": 30,
    "ConnectionTypeID": 2
  }
]
DateCreated2016-09-07T03:15:00Z
UsageTypeID6
OperatorInfo
{
  "ID": 5,
  "Title": "ChargePoint",
  "Comments": "GB*CPI,AT*HTB",
  "BookingURL": null,
  "WebsiteURL": "http://www.chargepoint.net/",
  "AddressInfo": null,
  "ContactEmail": null,
  "FaultReportEmail": null,
  "IsRestrictedEdit": false,
  "IsPrivateIndividual": false,
  "PhonePrimaryContact": "1-408-841-4500",
  "PhoneSecondaryContact": null
}
StatusTypeID50
DataProviderID1
NumberOfPoints1
GeneralCommentsFor Valet parking use during working hours.
DateLastVerified2016-11-25T10:34:00Z
DateLastStatusUpdate2016-11-25T10:34:00Z
SubmissionStatusTypeID200
SpotCharge · Data via OpenChargeMap