SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaStockton
CA-911231

ARCO

2459 E Mariposa Rd, Stockton, CA, 95205

ARCO is an EV charging location in Stockton, CA with 6 DC fast charging ports up to 150 kW on the bp pulse network. Public access. Listing data from OpenChargeMap, last refreshed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
150 kW
DC fast
Ports
6
ports
Hours
—
Pricing
—

Stations & ports

3 stations · 6 ports
ARCO · CCS 150kW
BP Pulse (US)
DC fast · 150 kW

150 kW can add 100 miles or more in 15 to 25 minutes, depending on the car.

1ACCS· 150 kW
1BCCS· 150 kW
ARCO · CCS 120kW
BP Pulse (US)
DC fast · 120 kW

120 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

2ACCS· 120 kW
2BCCS· 120 kW
ARCO · CHAdeMO 100kW
BP Pulse (US)
DC fast · 100 kW

100 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

3ACHAdeMO· 100 kW
3BCHAdeMO· 100 kW

Estimated charging time

DC fast charging · 150 kW
~23 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2459 E Mariposa Rd · Stockton, CA · 95205

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is ARCO located?
ARCO is located at 2459 E Mariposa Rd, Stockton, CA.
What kind of charging does ARCO offer?
ARCO offers DC fast charging, with stations rated up to 150 kW. There are 3 charging stations and 6 total ports at this location.
How long does it take to charge an EV at ARCO?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 23 min on 150 kW DC fast charging at ARCO. Actual times vary with vehicle, temperature, and station load.
What charging network operates ARCO?
ARCO is part of the bp pulse network. See more bp pulse charging across CA on SpotCharge.
Can anyone use the chargers at ARCO?
Yes — ARCO is a publicly accessible charging location.
Is the ARCO listing owner-managed?
Not yet. This page was generated from open charging data (OpenChargeMap) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
—
no port data

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Every EV registered in California is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More DC fast charging

DC fast charging in Stockton →DC fast charging in California →bp pulse in California →

More charging in Stockton

See all →

Stockton MOB

Stockton, CA

Level 2Electrify America
1 station · 2 ports3 kW

JOLLIBEE STN STATION 1

Stockton, CA

Level 2ChargePoint
1 station · 1 port6.5 kW

STOCKTON AIRPORT CA SDC

Stockton, CA

Level 2
1 station · 110 ports

952 - STOCKTON CA VMF

Stockton, CA

Level 2
1 station · 2 ports
Details
Phone
866-816-7584
Network
bp pulse ↗
Access
Public access

Data from OpenChargeMap

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

OpenChargeMap13 fields▾

From OpenChargeMap · CC-BY-SA 4.0

ID223400
UUID8757A629-8CB1-4310-BEF6-3A1B2B8971B4
OperatorID3788
AddressInfo
{
  "ID": 223783,
  "Town": "Stockton",
  "Title": "ARCO",
  "Latitude": 37.934803,
  "Postcode": "95205",
  "CountryID": 2,
  "Longitude": -121.237687,
  "RelatedURL": "https://www.bp.com/en_us/united-states/home/what-we-do/customers-and-products/bp-pulse/bp-pulse-products.html",
  "AddressLine1": "2459 E Mariposa Rd",
  "DistanceUnit": 0,
  "AccessComments": "",
  "StateOrProvince": "CA",
  "ContactTelephone1": "866-816-7584"
}
Connections
[
  {
    "ID": 374345,
    "LevelID": 3,
    "PowerKW": 100,
    "Comments": "",
    "Quantity": 2,
    "StatusTypeID": 50,
    "CurrentTypeID": 30,
    "ConnectionTypeID": 2
  },
  {
    "ID": 374346,
    "LevelID": 3,
    "PowerKW": 150,
    "Comments": "",
    "Quantity": 2,
    "StatusTypeID": 50,
    "CurrentTypeID": 30,
    "ConnectionTypeID": 32
  },
  {
    "ID": 552913,
    "LevelID": 3,
    "PowerKW": 120,
    "Quantity": 2,
    "StatusTypeID": 50,
    "CurrentTypeID": 30,
    "ConnectionTypeID": 32
  }
]
DateCreated2023-02-13T05:09:00Z
UsageTypeID1
OperatorInfo
{
  "ID": 3788,
  "Title": "BP Pulse (US)",
  "Comments": null,
  "BookingURL": null,
  "WebsiteURL": "https://www.bp.com/en_us/united-states/",
  "AddressInfo": null,
  "ContactEmail": null,
  "FaultReportEmail": null,
  "IsRestrictedEdit": false,
  "IsPrivateIndividual": false,
  "PhonePrimaryContact": null,
  "PhoneSecondaryContact": null
}
StatusTypeID50
DataProviderID1
DateLastVerified2024-06-05T15:23:00Z
DateLastStatusUpdate2024-06-05T15:23:00Z
SubmissionStatusTypeID100
SpotCharge · Data via OpenChargeMap