SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaMill Valley
CA-905900

Golden Gate National Recreation Area – Muir Woods

1 Muir Woods Rd, Mill Valley, CA, 94941

Golden Gate National Recreation Area – Muir Woods is a public in Mill Valley, CA with 2 Level 2 charging ports on the Rivian Waypoints network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Public access. Listing data from NREL, last confirmed June 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Public
Max power
—
AC Level 2
Ports
2
ports
Hours
—
Pricing
—

Stations & ports

1 station · 2 ports
Golden Gate National Recreation Area – Muir Woods · L2 J1772
RIVIAN_WAYPOINTS
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

Start session on RIVIAN_WAYPOINTS network →
1AJ1772
1BJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1 Muir Woods Rd · Mill Valley, CA · 94941

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Golden Gate National Recreation Area – Muir Woods located?
Golden Gate National Recreation Area – Muir Woods is located at 1 Muir Woods Rd, Mill Valley, CA.
What kind of charging does Golden Gate National Recreation Area – Muir Woods offer?
Golden Gate National Recreation Area – Muir Woods offers Level 2 (AC) charging. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Golden Gate National Recreation Area – Muir Woods?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at Golden Gate National Recreation Area – Muir Woods. Actual times vary with vehicle, temperature, and station load.
What charging network operates Golden Gate National Recreation Area – Muir Woods?
Golden Gate National Recreation Area – Muir Woods is part of the Rivian Waypoints network. See more Rivian Waypoints charging across CA on SpotCharge.
Can anyone use the chargers at Golden Gate National Recreation Area – Muir Woods?
Yes — Golden Gate National Recreation Area – Muir Woods is a publicly accessible charging location.
Is the Golden Gate National Recreation Area – Muir Woods listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
32.4
61,054 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 61,054 publicly-listed ports in California (35,126 Level 2 and 25,765 DC fast), that works out to roughly 32.4 EVs per public port and 59.5 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in Mill Valley

See all →

Strawberry Village - Tesla Supercharger

Mill Valley, CA

DC FastTesla
1 station · 12 ports325 kW

PWRO: GOGA Public Electric Vehicle Chargers - 2.C

Mill Valley, CA

Level 2
1 station · 2 ports

PWRO: GOGA Fleet Electric Vehicle Charger - 1

Mill Valley, CA

Level 2
1 station · 1 port

PWRO: GOGA Fleet Electric Vehicle Chargers - 2, Fort Cronkhite

Mill Valley, CA

Level 2
1 station · 2 ports
Details
Phone
866-576-1495
Network
Rivian Waypoints ↗
Access
Public access

Last updated · 3 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging