SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaArcadia
CA-896095

LA County DPR Arboretum

301 N Baldwin Ave, Arcadia, CA, 91007

LA County DPR Arboretum is a park in Arcadia, CA with 3 Level 2 charging ports on the PowerFlex network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Pricing: $0.45 per kWh from 4pm-9pm; $0.30 per kWh all other times. 24 hours daily. Public access. Listing data from NREL, last confirmed May 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🌳Park
📅Open since 2014
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
3
ports
Hours
24/7
24 hours daily
Pricing
Tiered pricing
$0.45 per kWh from 4pm-9pm; $0.30 per kWh all other times

Finding this location

  • Located in parking lot directly across from Harvard Dr

    Source · NREL

Stations & ports

1 station · 3 ports
LA County DPR Arboretum · L2 J1772
POWERFLEX
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

Start session on POWERFLEX network →
1AJ1772
1BJ1772
1CJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

301 N Baldwin Ave · Arcadia, CA · 91007

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is LA County DPR Arboretum located?
LA County DPR Arboretum is located at 301 N Baldwin Ave, Arcadia, CA.
What kind of charging does LA County DPR Arboretum offer?
LA County DPR Arboretum offers Level 2 (AC) charging. There is 1 charging station and 3 total ports at this location.
How long does it take to charge an EV at LA County DPR Arboretum?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at LA County DPR Arboretum. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at LA County DPR Arboretum?
$0.45 per kWh from 4pm-9pm; $0.30 per kWh all other times
What are LA County DPR Arboretum's charging hours?
24 hours daily
What charging network operates LA County DPR Arboretum?
LA County DPR Arboretum is part of the PowerFlex network. See more PowerFlex charging across CA on SpotCharge.
Can anyone use the chargers at LA County DPR Arboretum?
Yes — LA County DPR Arboretum is a publicly accessible charging location. NREL lists it as workplace charging, mainly for employees.
How do you pay for charging at LA County DPR Arboretum?
LA County DPR Arboretum accepts Proprietor fleet card, according to NREL.
Is the LA County DPR Arboretum listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
32.4
61,055 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 61,055 publicly-listed ports in California (35,127 Level 2 and 25,765 DC fast), that works out to roughly 32.4 EVs per public port and 59.5 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in Arcadia

See all →

57 WHEELER RESIDENTIAL 1

Arcadia, CA

Level 2ChargePoint
1 station · 2 ports6.5 kW

HOLY ANGELS HA 2

Arcadia, CA

Level 2ChargePoint
2 stations · 4 ports19.2 kW

HOLY ANGELS HA1

Arcadia, CA

Level 2ChargePoint
2 stations · 4 ports19.2 kW

LAS CASITAS LAS CASITAS

Arcadia, CA

Level 2ChargePoint
1 station · 1 port12 kW
Details
Hours
24 hours daily
Pricing
$0.45 per kWh from 4pm-9pm; $0.30 per kWh all other times
Phone
833-479-7359
Network
PowerFlex ↗
Access
Public access
Workplace charging, mainly for employees · From NREL
Payment
Proprietor fleet card
From NREL
Ownership
Privately owned
From NREL

Verified by NREL · 17 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id21450
zip91007
cityArcadia
plus4—
stateCA
ng_psi—
cng_psi—
countryUS
latitude34.145528
bd_blends—
longitude-118.050548
open_date2014-06-01
rd_blends—
ev_networkPOWERFLEX
ev_pricing$0.45 per kWh from 4pm-9pm; $0.30 per kWh all other times
updated_at2026-06-17T15:11:04Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameLA County DPR Arboretum
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typePARK
nps_unit_name—
station_phone833-479-7359
cards_acceptedProprietor
ev_dc_fast_num—
ev_network_webhttps://www.powerflex.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address301 N Baldwin Ave
funding_sources—
owner_type_codeP
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "POWERFLEX",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "POWERFLEX",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "POWERFLEX",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num3
access_days_time_fr—
date_last_confirmed2025-05-12
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingYes
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsLocated in parking lot directly across from Harvard Dr
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging