HOLOGIC Gen-Probe
San Diego, CA
Trillium - San Diego Metropolitan Transit System is a fleet garage in San Diego, CA with 4 DC fast charging ports up to 125 kW, not on a charging network. Charging is free. By appointment. Listing data from NREL, last confirmed June 2026.
Opportunity Rd and Ruffner St
Source · NREL
125 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.
50 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.
For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →
No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.
Charged here? Tell the next driver how it went:
No reviews yet — be the first to charge here and share your experience.
As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.
Every EV registered in California is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.
Source: AFDC (data from Experian Information Solutions) · See full California market data →
San Diego, CA
San Diego, CA
San Diego, CA
San Diego, CA
Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.
From U.S. DOE AFDC · Public domain
| id | 153212 |
|---|---|
| zip | 92111 |
| city | San Diego |
| plus4 | — |
| state | CA |
| ng_psi | — |
| cng_psi | — |
| country | US |
| latitude | 32.824786 |
| bd_blends | — |
| longitude | -117.157551 |
| open_date | 2020-06-01 |
| rd_blends | — |
| ev_network | Non-Networked |
| ev_pricing | Free |
| updated_at | 2026-06-12T17:15:57Z |
| access_code | private |
| cng_has_rng | — |
| lng_has_rng | — |
| lpg_primary | — |
| status_code | E |
| bd_blends_fr | — |
| hy_is_retail | — |
| hy_pressures | — |
| hy_standards | — |
| rd_blends_fr | — |
| station_name | Trillium - San Diego Metropolitan Transit System |
| ev_other_evse | — |
| ev_pricing_fr | — |
| expected_date | — |
| facility_type | FLEET_GARAGE |
| nps_unit_name | — |
| station_phone | — |
| cards_accepted | — |
| ev_dc_fast_num | 2 |
| ev_network_web | — |
| fuel_type_code | ELEC |
| geocode_status | 200-8 |
| hy_status_link | — |
| street_address | 4630 Ruffner St |
| funding_sources | — |
| owner_type_code | P |
| access_days_time | Fleet use only |
| e85_blender_pump | — |
| lpg_nozzle_types | — |
| ng_vehicle_class | — |
| related_stations | [
{
"id": 953,
"access_code": "private",
"fuel_type_code": "CNG"
}
] |
| cng_dispenser_num | — |
| cng_total_storage | — |
| cng_vehicle_class | — |
| ev_charging_units | [
{
"network": "Non-Networked",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 0
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": 50,
"port_count": 1
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": 125,
"port_count": 1
}
},
"port_count": 1,
"charging_level": "dc_fast",
"funding_sources": []
},
{
"network": "Non-Networked",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 0
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": 50,
"port_count": 1
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": 125,
"port_count": 1
}
},
"port_count": 1,
"charging_level": "dc_fast",
"funding_sources": []
}
] |
| lng_vehicle_class | — |
| ng_fill_type_code | — |
| restricted_access | — |
| access_detail_code | — |
| cng_fill_type_code | — |
| ev_connector_types | CHADEMO, J1772COMBO |
| ev_level1_evse_num | — |
| ev_level2_evse_num | — |
| access_days_time_fr | — |
| date_last_confirmed | 2026-06-12 |
| ev_renewable_source | — |
| cng_renewable_source | — |
| lng_renewable_source | — |
| cng_total_compression | — |
| ev_workplace_charging | No |
| maximum_vehicle_class | HD |
| rd_max_biodiesel_level | — |
| groups_with_access_code | Private |
| intersection_directions | Opportunity Rd and Ruffner St |
| e85_other_ethanol_blends | — |
| rd_blended_with_biodiesel | — |
| groups_with_access_code_fr | Privé |
| intersection_directions_fr | — |