SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaBellflower
CA-850741

8827 Artesia Blvd

8827 Artesia Blvd, Bellflower, CA, 90706
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
8827 Artesia Blvd · L2 J1772
EV Connect
AC L2 · 7.2 kW
Start session on EV Connect network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

8827 Artesia Blvd · Bellflower, CA · 90706

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is 8827 Artesia Blvd located?
8827 Artesia Blvd is located at 8827 Artesia Blvd, Bellflower, CA.
What kind of charging does 8827 Artesia Blvd offer?
8827 Artesia Blvd offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at 8827 Artesia Blvd?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at 8827 Artesia Blvd. Actual times vary with vehicle, temperature, and station load.
What are 8827 Artesia Blvd's charging hours?
Open 24 hours
What charging network operates 8827 Artesia Blvd?
8827 Artesia Blvd is part of the EV Connect network. See more EV Connect charging across CA on SpotCharge.
Can anyone use the chargers at 8827 Artesia Blvd?
Yes — 8827 Artesia Blvd is a publicly accessible charging location.
Is the 8827 Artesia Blvd listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
36
55,049 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 55,049 publicly-listed ports in California (31,353 Level 2 and 23,573 DC fast), that works out to roughly 36 EVs per public port and 65.1 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in Bellflower

See all →

Chase Bank - 16804 Bellflower Blvd

Bellflower, CA

DC FasteVgo Network
1 station · 4 ports50 kW

G&M OIL G&M #187

Bellflower, CA

DC FastChargePoint Network
2 stations · 2 ports50 kW

15747 Woodruff Ave Bellflower CA 90706

Bellflower, CA

Level 2EVGATEWAY
1 station · 4 ports7.2 kW

St. John Bosco High School

Bellflower, CA

Level 2FLO
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
866-816-7584
Network
EV Connect ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging