SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaChula Vista
CA-837216

San Diego KOA Resort

111 North Second Ave, Chula Vista, CA, 91910

San Diego KOA Resort is an EV charging location in Chula Vista, CA with 2 Level 2 charging ports up to 10 kW on the ChargeLab network. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2024
Max power
9.6 kW
AC Level 2
Ports
2
ports
Hours
—
Pricing
—

Stations & ports

1 station · 2 ports
San Diego KOA Resort · L2 J1772 9.6 kW
CHARGELAB
AC L2 · 9.6 kW

9.6 kW adds roughly 35 miles of range per hour for a typical EV.

Start session on CHARGELAB network →
1AJ1772· 9.6 kW
1BJ1772· 9.6 kW

Estimated charging time

Level 2 (AC) · 9.6 kW
~6 h 5 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

111 North Second Ave · Chula Vista, CA · 91910

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is San Diego KOA Resort located?
San Diego KOA Resort is located at 111 North Second Ave, Chula Vista, CA.
What kind of charging does San Diego KOA Resort offer?
San Diego KOA Resort offers Level 2 (AC) charging, with stations rated up to 9.6 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at San Diego KOA Resort?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 6 h 5 min on 9.6 kW Level 2 (AC) charging at San Diego KOA Resort. Actual times vary with vehicle, temperature, and station load.
What charging network operates San Diego KOA Resort?
San Diego KOA Resort is part of the ChargeLab network. See more ChargeLab charging across CA on SpotCharge.
Can anyone use the chargers at San Diego KOA Resort?
Yes — San Diego KOA Resort is a publicly accessible charging location.
Is the San Diego KOA Resort listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
—
no port data

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Every EV registered in California is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in Chula Vista

See all →

Element Chula Vista

Chula Vista, CA

Level 2EV Connect
1 station · 4 ports7.6 kW

Mossy Nissan Chula Vista, Inc.

Chula Vista, CA

DC FastVialynk
1 station · 2 ports54 kW

The Residences at Cota Vera

Chula Vista, CA

Level 2LOOP
1 station · 5 ports7.7 kW

Silvergate Development

Chula Vista, CA

Level 2Dirt Road
1 station · 18 ports7.2 kW
Details
Phone
800-636-0986
Network
ChargeLab ↗
Access
Public access

Verified by NREL · 1 day ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id360192
zip91910
cityChula Vista
plus4—
stateCA
ng_psi—
cng_psi—
countryUS
latitude32.65703
bd_blends—
longitude-117.080869
open_date2024-10-17
rd_blends—
ev_networkCHARGELAB
ev_pricing—
updated_at2026-09-19T04:18:26Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameSan Diego KOA Resort
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone800-636-0986
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "9aaae05f-d42f-491e-8184-26668c4185cc**1",
    "9f1affc5-2e02-461e-9736-e52683a45df6**1"
  ],
  "station": [
    "125-67c0961e79f80ff64ddcd451"
  ]
}
ev_network_webhttps://chargelab.co
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address111 North Second Ave
funding_sources—
owner_type_code—
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "CHARGELAB",
    "connectors": {
      "J1772": {
        "power_kw": 9.6,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "CHARGELAB",
    "connectors": {
      "J1772": {
        "power_kw": 9.6,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-19
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging