SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaBig Bear Lake
CA-811835

BIG BEAR BIG BEAR LAKE

630 Bartlett Road, Big Bear Lake, CA, 92315

BIG BEAR BIG BEAR LAKE is an EV charging location in Big Bear Lake, CA with 2 DC fast charging ports up to 40 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed November 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2023
Max power
40 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • Parking Lot

    Source · NREL

Stations & ports

2 stations · 2 ports
BIG BEAR BIG BEAR LAKE · DCFC CCS 40 kW
ChargePoint Network
DC fast · 40 kW

40 kW adds roughly 100 miles in about an hour, depending on the car.

Start session on ChargePoint Network network →
1ACCS· 40 kW
BIG BEAR BIG BEAR LAKE · DCFC CHAdeMO 40 kW
ChargePoint Network
DC fast · 40 kW

40 kW adds roughly 100 miles in about an hour, depending on the car.

Start session on ChargePoint Network network →
2ACHAdeMO· 40 kW

Estimated charging time

DC fast charging · 40 kW
~1 h 28 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

630 Bartlett Road · Big Bear Lake, CA · 92315

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is BIG BEAR BIG BEAR LAKE located?
BIG BEAR BIG BEAR LAKE is located at 630 Bartlett Road, Big Bear Lake, CA.
What kind of charging does BIG BEAR BIG BEAR LAKE offer?
BIG BEAR BIG BEAR LAKE offers DC fast charging, with stations rated up to 40 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at BIG BEAR BIG BEAR LAKE?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 28 min on 40 kW DC fast charging at BIG BEAR BIG BEAR LAKE. Actual times vary with vehicle, temperature, and station load.
What are BIG BEAR BIG BEAR LAKE's charging hours?
24 hours daily
What charging network operates BIG BEAR BIG BEAR LAKE?
BIG BEAR BIG BEAR LAKE is part of the ChargePoint network. See more ChargePoint charging across CA on SpotCharge.
Can anyone use the chargers at BIG BEAR BIG BEAR LAKE?
Yes — BIG BEAR BIG BEAR LAKE is a publicly accessible charging location.
Is the BIG BEAR BIG BEAR LAKE listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
31.4
63,138 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 63,138 publicly-listed ports in California (36,079 Level 2 and 26,896 DC fast), that works out to roughly 31.4 EVs per public port and 57 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More DC fast charging

DC fast charging in Big Bear Lake →DC fast charging in California →ChargePoint in California →

More charging in Big Bear Lake

See all →

Sunnybrook Estate

Big Bear Lake, CA

Level 2LOOP
1 station · 5 ports9.6 kW

Big Bear Lake

Big Bear Lake, CA

Level 2ChargePoint
1 station · 8 ports7.2 kW

Interlaken Shopping Center - Tesla Supercharger

Big Bear Lake, CA

DC FastTesla
1 station · 12 ports325 kW

Homestreet Bank Big Bear

Big Bear Lake, CA

DC FastLOOP
3 stations · 4 ports75 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 5 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center76 fields▾

From U.S. DOE AFDC · Public domain

id253852
zip92315
cityBig Bear Lake
plus4—
stateCA
ng_psi—
cng_psi—
countryUS
latitude34.240374
bd_blends—
longitude-116.91232
open_date2023-02-10
rd_blends—
ev_networkChargePoint Network
ev_pricing—
unverifiedNo
updated_at2026-11-05T02:19:26Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameBIG BEAR BIG BEAR LAKE
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "22762161"
  ],
  "station": [
    "USCPIL13400441"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address630 Bartlett Road
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 40,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 40,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-11-05
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsParking Lot
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging