SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaSacramento
CA-794820

Sacramento, Ca - Arden Way Supercharger

1689 Arden Way, Sacramento, CA, 95815
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
72 kW
DC fast
Ports
19
ports
Hours
24/7
Open 24 hours
Pricing
Tiered pricing
$0.26/kWh; other tariffs for older cars

Finding this location

  • Charging19 Superchargers, available 24/7, up to 150kW

    Source · OpenChargeMap

Stations & ports

1 station · 19 ports
Sacramento, Ca - Arden Way Supercharger
Tesla (Tesla-only charging)
DC fast · 72 kW
1ANACS· 72 kW
1BNACS· 72 kW
1CNACS· 72 kW
1DNACS· 72 kW
1ENACS· 72 kW
1FNACS· 72 kW
1GNACS· 72 kW
1HNACS· 72 kW
1INACS· 72 kW
1JNACS· 72 kW
1KNACS· 72 kW
1LNACS· 72 kW
1MNACS· 72 kW
1NNACS· 72 kW
1ONACS· 72 kW
1PNACS· 72 kW
1QNACS· 72 kW
1RNACS· 72 kW
1SNACS· 72 kW

Estimated charging time

DC fast charging · 72 kW
~49 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1689 Arden Way · Sacramento, CA · 95815

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Sacramento, Ca - Arden Way Supercharger located?
Sacramento, Ca - Arden Way Supercharger is located at 1689 Arden Way, Sacramento, CA.
What kind of charging does Sacramento, Ca - Arden Way Supercharger offer?
Sacramento, Ca - Arden Way Supercharger offers DC fast charging, with stations rated up to 72 kW. There is 1 charging station and 19 total ports at this location.
How long does it take to charge an EV at Sacramento, Ca - Arden Way Supercharger?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 49 min on 72 kW DC fast charging at Sacramento, Ca - Arden Way Supercharger. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Sacramento, Ca - Arden Way Supercharger?
$0.26/kWh; other tariffs for older cars
What are Sacramento, Ca - Arden Way Supercharger's charging hours?
Open 24 hours
What charging network operates Sacramento, Ca - Arden Way Supercharger?
Sacramento, Ca - Arden Way Supercharger is part of the Tesla (Tesla-only charging) network. See more Tesla (Tesla-only charging) charging across CA on SpotCharge.
Can anyone use the chargers at Sacramento, Ca - Arden Way Supercharger?
Yes — Sacramento, Ca - Arden Way Supercharger is a publicly accessible charging location.
Is the Sacramento, Ca - Arden Way Supercharger listing owner-managed?
Not yet. This page was generated from open charging data (OpenChargeMap) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
36
55,049 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 55,049 publicly-listed ports in California (31,353 Level 2 and 23,573 DC fast), that works out to roughly 36 EVs per public port and 65.1 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in Sacramento

See all →

Central Garage

Sacramento, CA

Level 2EVGATEWAY
1 station · 4 ports7.2 kW

West Garage

Sacramento, CA

Level 2EVGATEWAY
1 station · 7 ports7.2 kW

Sawyer Garage Public

Sacramento, CA

Level 2EVGATEWAY
1 station · 4 ports7.2 kW

IRONGATE APTS BLDG 1 RIGHT

Sacramento, CA

Level 2ChargePoint Network
1 station · 1 port7.2 kW
Details
Hours
Open 24 hours
Pricing
$0.26/kWh; other tariffs for older cars
Network
Tesla (Tesla-only charging) ↗
Access
Public access

Data from OpenChargeMap

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

OpenChargeMap17 fields▾

From OpenChargeMap · CC-BY-SA 4.0

ID171577
UUID0DE5C584-BC19-4B31-8227-AABBD246F8B3
UsageCost$0.26/kWh; other tariffs for older cars
OperatorID23
AddressInfo
{
  "ID": 171936,
  "Town": "Sacramento",
  "Title": "Sacramento, Ca - Arden Way Supercharger",
  "Latitude": 38.603204,
  "Postcode": "95815",
  "CountryID": 2,
  "Longitude": -121.428647,
  "AddressLine1": "1689 Arden Way",
  "DistanceUnit": 0,
  "StateOrProvince": "CA"
}
Connections
[
  {
    "ID": 262375,
    "LevelID": 3,
    "PowerKW": 72,
    "Quantity": 19,
    "StatusTypeID": 50,
    "CurrentTypeID": 30,
    "ConnectionTypeID": 27
  }
]
DateCreated2021-01-05T06:48:00Z
UsageTypeID1
OperatorInfo
{
  "ID": 23,
  "Title": "Tesla (Tesla-only charging)",
  "Comments": null,
  "BookingURL": null,
  "WebsiteURL": "http://www.teslamotors.com",
  "AddressInfo": null,
  "ContactEmail": null,
  "FaultReportEmail": null,
  "IsRestrictedEdit": false,
  "IsPrivateIndividual": false,
  "PhonePrimaryContact": null,
  "PhoneSecondaryContact": null
}
StatusTypeID50
DataProviderID1
NumberOfPoints19
GeneralCommentsCharging19 Superchargers, available 24/7, up to 150kW
DateLastVerified2023-12-07T12:52:00Z
OperatorsReference56112
DateLastStatusUpdate2023-12-07T12:52:00Z
SubmissionStatusTypeID200
SpotCharge · Data via OpenChargeMap