SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaWalnut Creek
CA-712685

WALNUT CREEK WIGET 3-4

111 North Wiget Ln, Walnut Creek, CA, 94598

WALNUT CREEK WIGET 3-4 is an EV charging location in Walnut Creek, CA with 2 Level 2 charging ports up to 7 kW on the ChargePoint network. Mon: 6:00am-11:00pm; Tue: 6:00am-11:00pm; Wed: 6:00am-11:00pm; Thu: 6:00am-11:00pm; Fri: 6:00am-11:00pm; Sat: 6:00am-11:00pm; Sun: 6:00am-11:00pm. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2021
Max power
6.5 kW
AC Level 2
Ports
2
ports
Hours
Hours
Mon: 6:00am-11:00pm; Tue: 6:00am-11:00pm; Wed: 6:00am-11:00pm; Thu: 6:00am-11:00pm; Fri: 6:00am-11:00pm; Sat: 6:00am-11:00pm; Sun: 6:00am-11:00pm
Pricing
—

Finding this location

  • EV Panel 9,11 / 13,15

    Source · NREL

Stations & ports

1 station · 2 ports
WALNUT CREEK WIGET 3-4 · L2 J1772 6.5 kW
ChargePoint Network
AC L2 · 6.5 kW

6.5 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 6.5 kW
1BJ1772· 6.5 kW

Estimated charging time

Level 2 (AC) · 6.5 kW
~8 h 58 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

111 North Wiget Ln · Walnut Creek, CA · 94598

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is WALNUT CREEK WIGET 3-4 located?
WALNUT CREEK WIGET 3-4 is located at 111 North Wiget Ln, Walnut Creek, CA.
What kind of charging does WALNUT CREEK WIGET 3-4 offer?
WALNUT CREEK WIGET 3-4 offers Level 2 (AC) charging, with stations rated up to 6.5 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at WALNUT CREEK WIGET 3-4?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 58 min on 6.5 kW Level 2 (AC) charging at WALNUT CREEK WIGET 3-4. Actual times vary with vehicle, temperature, and station load.
What are WALNUT CREEK WIGET 3-4's charging hours?
Mon: 6:00am-11:00pm; Tue: 6:00am-11:00pm; Wed: 6:00am-11:00pm; Thu: 6:00am-11:00pm; Fri: 6:00am-11:00pm; Sat: 6:00am-11:00pm; Sun: 6:00am-11:00pm
What charging network operates WALNUT CREEK WIGET 3-4?
WALNUT CREEK WIGET 3-4 is part of the ChargePoint network. See more ChargePoint charging across CA on SpotCharge.
Can anyone use the chargers at WALNUT CREEK WIGET 3-4?
Yes — WALNUT CREEK WIGET 3-4 is a publicly accessible charging location.
Is the WALNUT CREEK WIGET 3-4 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
32.4
61,055 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 61,055 publicly-listed ports in California (35,127 Level 2 and 25,765 DC fast), that works out to roughly 32.4 EVs per public port and 59.5 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in Walnut Creek

See all →

Walnut Creek, CA - 1600 Palos Verdes Mall - Tesla Supercharger

Walnut Creek, CA

DC FastTesla
1 station · 12 ports250 kW

CFA 05340 OAK GROVE #3

Walnut Creek, CA

Level 2ChargePoint
1 station · 2 ports6.5 kW

Mercedes-Benz of Walnut Creek

Walnut Creek, CA

DC FastChaevi
1 station · 2 ports15 kW

Ygnacio Plaza - Tesla Supercharger

Walnut Creek, CA

DC FastTesla
1 station · 12 ports325 kW
Details
Hours
Mon: 6:00am-11:00pm; Tue: 6:00am-11:00pm; Wed: 6:00am-11:00pm; Thu: 6:00am-11:00pm; Fri: 6:00am-11:00pm; Sat: 6:00am-11:00pm; Sun: 6:00am-11:00pm
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 4 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id184882
zip94598
cityWalnut Creek
plus4—
stateCA
ng_psi—
cng_psi—
countryUS
latitude37.924942
bd_blends—
longitude-122.0249
open_date2021-02-12
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-16T01:44:41Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameWALNUT CREEK WIGET 3-4
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "25377471",
    "25377481"
  ],
  "station": [
    "USCPIL5553161"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address111 North Wiget Ln
funding_sources—
owner_type_code—
access_days_timeMon: 6:00am-11:00pm; Tue: 6:00am-11:00pm; Wed: 6:00am-11:00pm; Thu: 6:00am-11:00pm; Fri: 6:00am-11:00pm; Sat: 6:00am-11:00pm; Sun: 6:00am-11:00pm
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-16
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsEV Panel 9,11 / 13,15
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging