SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaChico
CA-702869

CHICO 1 2 PUBLIC 2

2562 Cohasset Rd, Chico, CA, 95973

CHICO 1 2 PUBLIC 2 is an EV charging location in Chico, CA with 2 DC fast charging ports up to 125 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2023
Max power
125 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • Near front entrance

    Source · NREL

Stations & ports

2 stations · 2 ports
CHICO 1 2 PUBLIC 2 · DCFC CCS 125 kW
ChargePoint Network
DC fast · 125 kW

125 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACCS· 125 kW
CHICO 1 2 PUBLIC 2 · DCFC CHAdeMO 125 kW
ChargePoint Network
DC fast · 125 kW

125 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
2ACHAdeMO· 125 kW

Estimated charging time

DC fast charging · 125 kW
~28 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2562 Cohasset Rd · Chico, CA · 95973

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is CHICO 1 2 PUBLIC 2 located?
CHICO 1 2 PUBLIC 2 is located at 2562 Cohasset Rd, Chico, CA.
What kind of charging does CHICO 1 2 PUBLIC 2 offer?
CHICO 1 2 PUBLIC 2 offers DC fast charging, with stations rated up to 125 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at CHICO 1 2 PUBLIC 2?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 28 min on 125 kW DC fast charging at CHICO 1 2 PUBLIC 2. Actual times vary with vehicle, temperature, and station load.
What are CHICO 1 2 PUBLIC 2's charging hours?
24 hours daily
What charging network operates CHICO 1 2 PUBLIC 2?
CHICO 1 2 PUBLIC 2 is part of the ChargePoint network. See more ChargePoint charging across CA on SpotCharge.
Can anyone use the chargers at CHICO 1 2 PUBLIC 2?
Yes — CHICO 1 2 PUBLIC 2 is a publicly accessible charging location.
Is the CHICO 1 2 PUBLIC 2 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
32.4
61,055 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 61,055 publicly-listed ports in California (35,127 Level 2 and 25,765 DC fast), that works out to roughly 32.4 EVs per public port and 59.5 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More DC fast charging

DC fast charging in Chico →DC fast charging in California →ChargePoint in California →

More charging in Chico

See all →

Chick-fil-A Store #5960 - Chico

Chico, CA

Level 2EV Connect
1 station · 4 ports11 kW

Residence Inn Chico

Chico, CA

Level 2LOOP
1 station · 4 ports7.7 kW

HHM Courtyard Chico 2481

Chico, CA

Level 2LOOP
1 station · 4 ports7.7 kW

Enclave Apartments

Chico, CA

Level 2Blink
1 station · 2 ports6.2 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id303624
zip95973
cityChico
plus4—
stateCA
ng_psi—
cng_psi—
countryUS
latitude39.762894
bd_blends—
longitude-121.843037
open_date2023-07-28
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-18T02:02:52Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameCHICO 1 2 PUBLIC 2
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "22007151"
  ],
  "station": [
    "USCPIL12746661"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address2562 Cohasset Rd
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 125,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 125,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsNear front entrance
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging