SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
ยฉ 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaChula Vista
CA-694730

CHULA VISTA A02

1244 Oleander Ave, Chula Vista, CA, 91911

CHULA VISTA A02 is an EV charging location in Chula Vista, CA with 2 DC fast charging ports up to 40 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
๐ŸŒImported from open data
๐Ÿ“…Open since 2021
Max power
40 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
โ€”

Stations & ports

2 stations ยท 2 ports
CHULA VISTA A02 ยท DCFC CCS 40 kW
ChargePoint Network
DC fast ยท 40 kW

40 kW adds roughly 100 miles in about an hour, depending on the car.

Start session on ChargePoint Network network โ†’
1ACCSยท 40 kW
CHULA VISTA A02 ยท DCFC CHAdeMO 40 kW
ChargePoint Network
DC fast ยท 40 kW

40 kW adds roughly 100 miles in about an hour, depending on the car.

Start session on ChargePoint Network network โ†’
2ACHAdeMOยท 40 kW

Estimated charging time

DC fast charging ยท 40 kW
~1 h 28 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV โ†’

1244 Oleander Ave ยท Chula Vista, CA ยท 91911

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet โ€” be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is CHULA VISTA A02 located?
CHULA VISTA A02 is located at 1244 Oleander Ave, Chula Vista, CA.
What kind of charging does CHULA VISTA A02 offer?
CHULA VISTA A02 offers DC fast charging, with stations rated up to 40 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at CHULA VISTA A02?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 28 min on 40 kW DC fast charging at CHULA VISTA A02. Actual times vary with vehicle, temperature, and station load.
What are CHULA VISTA A02's charging hours?
24 hours daily
What charging network operates CHULA VISTA A02?
CHULA VISTA A02 is part of the ChargePoint network. See more ChargePoint charging across CA on SpotCharge.
Can anyone use the chargers at CHULA VISTA A02?
Yes โ€” CHULA VISTA A02 is a publicly accessible charging location.
Is the CHULA VISTA A02 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California ยท 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
32.4
61,055 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered โ€” 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 61,055 publicly-listed ports in California (35,127 Level 2 and 25,765 DC fast), that works out to roughly 32.4 EVs per public port and 59.5 BEVs per DC fast port.

California's public charging is keeping pace with adoption โ€” but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) ยท See full California market data โ†’

More DC fast charging

DC fast charging in Chula Vista โ†’DC fast charging in California โ†’ChargePoint in California โ†’

More charging in Chula Vista

See all โ†’

Element Chula Vista

Chula Vista, CA

Level 2EV Connect
1 station ยท 4 ports7.6 kW

Mossy Nissan Chula Vista, Inc.

Chula Vista, CA

DC FastVialynk
1 station ยท 2 ports54 kW

The Residences at Cota Vera

Chula Vista, CA

Level 2LOOP
1 station ยท 5 ports7.7 kW

Silvergate Development

Chula Vista, CA

Level 2Dirt Road
1 station ยท 18 ports7.2 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint โ†—
Access
Public access

Verified by NREL ยท 4 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fieldsโ–พ

From U.S. DOE AFDC ยท Public domain

id175440
zip91911
cityChula Vista
plus4โ€”
stateCA
ng_psiโ€”
cng_psiโ€”
countryUS
latitude32.618024
bd_blendsโ€”
longitude-117.035028
open_date2021-01-27
rd_blendsโ€”
ev_networkChargePoint Network
ev_pricingโ€”
updated_at2026-09-16T01:36:03Z
access_codepublic
cng_has_rngโ€”
lng_has_rngโ€”
lpg_primaryโ€”
status_codeE
bd_blends_frโ€”
hy_is_retailโ€”
hy_pressuresโ€”
hy_standardsโ€”
rd_blends_frโ€”
station_nameCHULA VISTA A02
ev_other_evseโ€”
ev_pricing_frโ€”
expected_dateโ€”
facility_typeโ€”
nps_unit_nameโ€”
station_phone888-758-4389
cards_acceptedโ€”
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "2873591"
  ],
  "station": [
    "USCPIL2299121"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_linkโ€”
street_address1244 Oleander Ave
funding_sourcesโ€”
owner_type_codeโ€”
access_days_time24 hours daily
e85_blender_pumpโ€”
lpg_nozzle_typesโ€”
ng_vehicle_classโ€”
related_stationsโ€”
cng_dispenser_numโ€”
cng_total_storageโ€”
cng_vehicle_classโ€”
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 40,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 40,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_classโ€”
ng_fill_type_codeโ€”
restricted_accessNo
access_detail_codeโ€”
cng_fill_type_codeโ€”
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_numโ€”
ev_level2_evse_numโ€”
access_days_time_frโ€”
date_last_confirmed2026-09-16
ev_renewable_sourceโ€”
cng_renewable_sourceโ€”
lng_renewable_sourceโ€”
cng_total_compressionโ€”
ev_workplace_chargingNo
maximum_vehicle_classโ€”
rd_max_biodiesel_levelโ€”
groups_with_access_codePublic
intersection_directionsโ€”
e85_other_ethanol_blendsโ€”
rd_blended_with_biodieselโ€”
groups_with_access_code_frPublic
intersection_directions_frโ€”
SpotCharge ยท Owner-listed EV charging