SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaEl Monte
CA-684717

Aston at Gateway

10568 Gateway Promenade, El Monte, CA, 91731

Aston at Gateway is a other in El Monte, CA with 11 Level 2 charging ports on the LOOP network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Pricing: $1 activation fee; $0.15 per kWh. Public access. Listing data from NREL, last confirmed March 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Other
Max power
—
AC Level 2
Ports
11
ports
Hours
—
Pricing
Tiered pricing
$1 activation fee; $0.15 per kWh

Stations & ports

1 station · 11 ports
Aston at Gateway · L2 J1772
LOOP
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

Start session on LOOP network →
1AJ1772
1BJ1772
1CJ1772
1DJ1772
1EJ1772
1FJ1772
1GJ1772
1HJ1772
1IJ1772
1JJ1772
1KJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

10568 Gateway Promenade · El Monte, CA · 91731

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Aston at Gateway located?
Aston at Gateway is located at 10568 Gateway Promenade, El Monte, CA.
What kind of charging does Aston at Gateway offer?
Aston at Gateway offers Level 2 (AC) charging. There is 1 charging station and 11 total ports at this location.
How long does it take to charge an EV at Aston at Gateway?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at Aston at Gateway. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Aston at Gateway?
$1 activation fee; $0.15 per kWh
What charging network operates Aston at Gateway?
Aston at Gateway is part of the LOOP network. See more LOOP charging across CA on SpotCharge.
Can anyone use the chargers at Aston at Gateway?
Yes — Aston at Gateway is a publicly accessible charging location.
Is the Aston at Gateway listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
—
no port data

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Every EV registered in California is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in El Monte

See all →

Fresh & Flash Market - Tesla Supercharger

El Monte, CA

DC FastTesla
1 station · 16 ports

Mountain View High School

El Monte, CA

Level 2EV Connect
1 station · 1 port16.8 kW

Arroyo High School

El Monte, CA

Level 2EV Connect
1 station · 1 port7.2 kW

El Monte, CA - Peck Road - Tesla Supercharger

El Monte, CA

DC FastTesla
1 station · 20 ports250 kW
Details
Pricing
$1 activation fee; $0.15 per kWh
Phone
888-385-6671
Network
LOOP ↗
Access
Public access

Last updated · 6 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging