SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaChula Vista
CA-657021

Broadway Plaza

1142 Broadway, Chula Vista, CA, 91911

Broadway Plaza is an EV charging location in Chula Vista, CA with 4 DC fast charging ports up to 50 kW on the EVgo network. 24 hours daily. Public access. Listing data from NREL, last confirmed October 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2014
Max power
50 kW
DC fast
Ports
4
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 4 ports
Broadway Plaza · DCFC CCS 50 kW
eVgo Network
DC fast · 50 kW

50 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on eVgo Network network →
1ACCS· 50 kW
1BCCS· 50 kW
Broadway Plaza · DCFC CHAdeMO 50 kW
eVgo Network
DC fast · 50 kW

50 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on eVgo Network network →
2ACHAdeMO· 50 kW
2BCHAdeMO· 50 kW

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1142 Broadway · Chula Vista, CA · 91911

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Broadway Plaza located?
Broadway Plaza is located at 1142 Broadway, Chula Vista, CA.
What kind of charging does Broadway Plaza offer?
Broadway Plaza offers DC fast charging, with stations rated up to 50 kW. There are 2 charging stations and 4 total ports at this location.
How long does it take to charge an EV at Broadway Plaza?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging at Broadway Plaza. Actual times vary with vehicle, temperature, and station load.
What are Broadway Plaza's charging hours?
24 hours daily
What charging network operates Broadway Plaza?
Broadway Plaza is part of the EVgo network. See more EVgo charging across CA on SpotCharge.
Can anyone use the chargers at Broadway Plaza?
Yes — Broadway Plaza is a publicly accessible charging location.
Is the Broadway Plaza listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
31.4
63,056 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 63,056 publicly-listed ports in California (36,056 Level 2 and 26,837 DC fast), that works out to roughly 31.4 EVs per public port and 57.2 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More DC fast charging

DC fast charging in Chula Vista →DC fast charging in California →EVgo in California →

More charging in Chula Vista

See all →

TOWN CENTER GAR SPACE 163-164

Chula Vista, CA

Level 2ChargePoint
1 station · 2 ports6.5 kW

Element Chula Vista

Chula Vista, CA

Level 2EV Connect
1 station · 4 ports7.6 kW

Mossy Nissan Chula Vista, Inc.

Chula Vista, CA

DC FastVialynk
1 station · 2 ports54 kW

The Residences at Cota Vera

Chula Vista, CA

Level 2LOOP
1 station · 3 ports7.7 kW
Details
Hours
24 hours daily
Phone
877-455-3833
Network
EVgo ↗
Access
Public access

Verified by NREL · 1 week ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center76 fields▾

From U.S. DOE AFDC · Public domain

id228226
zip91911
cityChula Vista
plus4—
stateCA
ng_psi—
cng_psi—
countryUS
latitude32.607978
bd_blends—
longitude-117.080893
open_date2014-01-13
rd_blends—
ev_networkeVgo Network
ev_pricing—
unverifiedNo
updated_at2026-10-29T23:57:57Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameBroadway Plaza
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone877-455-3833
cards_accepted—
ev_dc_fast_num2
ev_network_ids
{
  "posts": [
    "399",
    "6159"
  ],
  "station": [
    "303"
  ]
}
ev_network_webhttps://www.evgo.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address1142 Broadway
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "eVgo Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 50,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 50,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "eVgo Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 50,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 50,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-10-29
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging