SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaRedding
CA-575606

BW plus hilltop inn

2300 Hilltop Drive, Redding, CA, 96002
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
4
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 4 ports
BW plus hilltop inn · L2 J1772
NOODOE
AC L2 · 7.2 kW
Start session on NOODOE network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2300 Hilltop Drive · Redding, CA · 96002

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is BW plus hilltop inn located?
BW plus hilltop inn is located at 2300 Hilltop Drive, Redding, CA.
What kind of charging does BW plus hilltop inn offer?
BW plus hilltop inn offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 4 total ports at this location.
How long does it take to charge an EV at BW plus hilltop inn?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at BW plus hilltop inn. Actual times vary with vehicle, temperature, and station load.
What are BW plus hilltop inn's charging hours?
Open 24 hours
What charging network operates BW plus hilltop inn?
BW plus hilltop inn is part of the NOODOE network. See more NOODOE charging across CA on SpotCharge.
Can anyone use the chargers at BW plus hilltop inn?
Yes — BW plus hilltop inn is a publicly accessible charging location.
Is the BW plus hilltop inn listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
36
55,049 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 55,049 publicly-listed ports in California (31,353 Level 2 and 23,573 DC fast), that works out to roughly 36 EVs per public port and 65.1 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in Redding

See all →

CHURN CREEK MARKETPLACE 04

Redding, CA

DC FastChargePoint Network
2 stations · 2 ports50 kW

TA, Knighton Rd. Redding, CA

Redding, CA

DC FastBP_PULSE
2 stations · 12 ports50 kW

Ethan Conrad 64

Redding, CA

DC FasteVgo Network
2 stations · 8 ports50 kW

Redding Field Office-1

Redding, CA

Level 2Non-Networked
1 station · 1 port7.2 kW
Details
Hours
Open 24 hours
Phone
888-222-6618
Network
NOODOE ↗
Access
Public access

Last updated · 5 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging