SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
ยฉ 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaOakland
CA-477128

19TH & HARRISON WEBSTER SIDE 4

301 19th St, Oakland, CA, 94612

19TH & HARRISON WEBSTER SIDE 4 is an EV charging location in Oakland, CA with 1 Level 2 charging port up to 7 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
๐ŸŒImported from open data
๐Ÿ“…Open since 2023
Max power
6.5 kW
AC Level 2
Ports
1
port
Hours
24/7
24 hours daily
Pricing
โ€”

Stations & ports

1 station ยท 1 port
19TH & HARRISON WEBSTER SIDE 4 ยท L2 J1772 6.5 kW
ChargePoint Network
AC L2 ยท 6.5 kW

6.5 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on ChargePoint Network network โ†’
1AJ1772ยท 6.5 kW

Estimated charging time

Level 2 (AC) ยท 6.5 kW
~8 h 58 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV โ†’

301 19th St ยท Oakland, CA ยท 94612

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet โ€” be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is 19TH & HARRISON WEBSTER SIDE 4 located?
19TH & HARRISON WEBSTER SIDE 4 is located at 301 19th St, Oakland, CA.
What kind of charging does 19TH & HARRISON WEBSTER SIDE 4 offer?
19TH & HARRISON WEBSTER SIDE 4 offers Level 2 (AC) charging, with stations rated up to 6.5 kW. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at 19TH & HARRISON WEBSTER SIDE 4?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 58 min on 6.5 kW Level 2 (AC) charging at 19TH & HARRISON WEBSTER SIDE 4. Actual times vary with vehicle, temperature, and station load.
What are 19TH & HARRISON WEBSTER SIDE 4's charging hours?
24 hours daily
What charging network operates 19TH & HARRISON WEBSTER SIDE 4?
19TH & HARRISON WEBSTER SIDE 4 is part of the ChargePoint network. See more ChargePoint charging across CA on SpotCharge.
Can anyone use the chargers at 19TH & HARRISON WEBSTER SIDE 4?
Yes โ€” 19TH & HARRISON WEBSTER SIDE 4 is a publicly accessible charging location.
Is the 19TH & HARRISON WEBSTER SIDE 4 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California ยท 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
32.4
61,055 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered โ€” 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 61,055 publicly-listed ports in California (35,127 Level 2 and 25,765 DC fast), that works out to roughly 32.4 EVs per public port and 59.5 BEVs per DC fast port.

California's public charging is keeping pace with adoption โ€” but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) ยท See full California market data โ†’

More charging in Oakland

See all โ†’

AMS CHARGE AMS

Oakland, CA

Level 2ChargePoint
1 station ยท 2 ports6.5 kW

MARKET SQUARE L2 STN 63

Oakland, CA

Level 2ChargePoint
1 station ยท 1 port6.5 kW

MARKET SQUARE L1 STN92-101

Oakland, CA

Level 2ChargePoint
1 station ยท 2 ports6.5 kW

CPF50 REAR CPF50 REAR

Oakland, CA

Level 2ChargePoint
1 station ยท 1 port7.7 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint โ†—
Access
Public access

Verified by NREL ยท 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fieldsโ–พ

From U.S. DOE AFDC ยท Public domain

id287188
zip94612
cityOakland
plus4โ€”
stateCA
ng_psiโ€”
cng_psiโ€”
countryUS
latitude37.806239
bd_blendsโ€”
longitude-122.265928
open_date2023-06-23
rd_blendsโ€”
ev_networkChargePoint Network
ev_pricingโ€”
updated_at2026-09-18T01:36:39Z
access_codepublic
cng_has_rngโ€”
lng_has_rngโ€”
lpg_primaryโ€”
status_codeE
bd_blends_frโ€”
hy_is_retailโ€”
hy_pressuresโ€”
hy_standardsโ€”
rd_blends_frโ€”
station_name19TH & HARRISON WEBSTER SIDE 4
ev_other_evseโ€”
ev_pricing_frโ€”
expected_dateโ€”
facility_typeโ€”
nps_unit_nameโ€”
station_phone888-758-4389
cards_acceptedโ€”
ev_dc_fast_numโ€”
ev_network_ids
{
  "posts": [
    "9042341"
  ],
  "station": [
    "USCPIL5436891"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_linkโ€”
street_address301 19th St
funding_sourcesโ€”
owner_type_codeโ€”
access_days_time24 hours daily
e85_blender_pumpโ€”
lpg_nozzle_typesโ€”
ng_vehicle_classโ€”
related_stationsโ€”
cng_dispenser_numโ€”
cng_total_storageโ€”
cng_vehicle_classโ€”
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_classโ€”
ng_fill_type_codeโ€”
restricted_accessNo
access_detail_codeโ€”
cng_fill_type_codeโ€”
ev_connector_typesJ1772
ev_level1_evse_numโ€”
ev_level2_evse_num1
access_days_time_frโ€”
date_last_confirmed2026-09-18
ev_renewable_sourceโ€”
cng_renewable_sourceโ€”
lng_renewable_sourceโ€”
cng_total_compressionโ€”
ev_workplace_chargingNo
maximum_vehicle_classโ€”
rd_max_biodiesel_levelโ€”
groups_with_access_codePublic
intersection_directionsโ€”
e85_other_ethanol_blendsโ€”
rd_blended_with_biodieselโ€”
groups_with_access_code_frPublic
intersection_directions_frโ€”
SpotCharge ยท Owner-listed EV charging