SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaEureka
CA-464674

TERRA DC 24KW HARPER KIA

4800 US-101, Eureka, CA, 95503

TERRA DC 24KW HARPER KIA is an EV charging location in Eureka, CA with 1 DC fast charging port up to 24 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed October 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2026
Max power
23.9 kW
DC fast
Ports
1
port
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • Not for customer use

    Source · NREL

Stations & ports

1 station · 1 port
TERRA DC 24KW HARPER KIA · DCFC CCS 23.9 kW
ChargePoint Network
DC fast · 23.9 kW

23.9 kW adds roughly 100 miles in about an hour, depending on the car.

Start session on ChargePoint Network network →
1ACCS· 23.9 kW

Estimated charging time

DC fast charging · 23.9 kW
~2 h 26 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

4800 US-101 · Eureka, CA · 95503

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is TERRA DC 24KW HARPER KIA located?
TERRA DC 24KW HARPER KIA is located at 4800 US-101, Eureka, CA.
What kind of charging does TERRA DC 24KW HARPER KIA offer?
TERRA DC 24KW HARPER KIA offers DC fast charging, with stations rated up to 23.9 kW. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at TERRA DC 24KW HARPER KIA?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 2 h 26 min on 23.9 kW DC fast charging at TERRA DC 24KW HARPER KIA. Actual times vary with vehicle, temperature, and station load.
What are TERRA DC 24KW HARPER KIA's charging hours?
24 hours daily
What charging network operates TERRA DC 24KW HARPER KIA?
TERRA DC 24KW HARPER KIA is part of the ChargePoint network. See more ChargePoint charging across CA on SpotCharge.
Can anyone use the chargers at TERRA DC 24KW HARPER KIA?
Yes — TERRA DC 24KW HARPER KIA is a publicly accessible charging location.
Is the TERRA DC 24KW HARPER KIA listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
31.4
63,059 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 63,059 publicly-listed ports in California (36,049 Level 2 and 26,847 DC fast), that works out to roughly 31.4 EVs per public port and 57.1 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More DC fast charging

DC fast charging in Eureka →DC fast charging in California →ChargePoint in California →

More charging in Eureka

See all →

Home2 Suites by Hilton Eureka - Tesla Destination

Eureka, CA

Level 2Tesla Destination
2 stations · 8 ports7 kW

RCEA EV NETWORK EUREKA DMV 1

Eureka, CA

Level 2ChargePoint
1 station · 2 ports19.2 kW

Eureka Village Pantry

Eureka, CA

DC FastLevel 2EV Range
3 stations · 5 ports200 kW

RCEA EV NETWORK SEQUOIA PARK 2

Eureka, CA

Level 2ChargePoint
1 station · 2 ports19.2 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 4 weeks ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id468118
zip95503
cityEureka
plus4—
stateCA
ng_psi—
cng_psi—
countryUS
latitude40.808404
bd_blends—
longitude-124.113616
open_date2026-09-05
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-10-10T02:14:39Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameTERRA DC 24KW HARPER KIA
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "22176071"
  ],
  "station": [
    "USCPIL12892901"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address4800 US-101
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 23.9,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-10-10
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsNot for customer use
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging