SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaLa Canada Flintridge
CA-373751

Jet Propulsion Lab - Passedena - Station 1

DSN Rd, La Canada Flintridge, CA, 91011
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Fed gov
Max power
50 kW
DC fast
Ports
4
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

2 stations · 4 ports
Jet Propulsion Lab - Passedena - Station 1 · DCFC CHAdeMO
Non-Networked
DC fast · 50 kW
1ACHAdeMO· 50 kW· 480V/100A
1BCHAdeMO· 50 kW· 480V/100A
Jet Propulsion Lab - Passedena - Station 1 · L2 J1772
Non-Networked
AC L2 · 7.2 kW
2AJ1772· 7.2 kW· 240V/30A
2BJ1772· 7.2 kW· 240V/30A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min
Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

DSN Rd · La Canada Flintridge, CA · 91011

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Jet Propulsion Lab - Passedena - Station 1 located?
Jet Propulsion Lab - Passedena - Station 1 is located at DSN Rd, La Canada Flintridge, CA.
What kind of charging does Jet Propulsion Lab - Passedena - Station 1 offer?
Jet Propulsion Lab - Passedena - Station 1 offers DC fast charging and Level 2 (AC) charging, with stations rated up to 50 kW. There are 2 charging stations and 4 total ports at this location.
How long does it take to charge an EV at Jet Propulsion Lab - Passedena - Station 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging, or about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Jet Propulsion Lab - Passedena - Station 1. Actual times vary with vehicle, temperature, and station load.
What are Jet Propulsion Lab - Passedena - Station 1's charging hours?
Open 24 hours
What charging network operates Jet Propulsion Lab - Passedena - Station 1?
Jet Propulsion Lab - Passedena - Station 1 is part of the Non-Networked network. See more Non-Networked charging across CA on SpotCharge.
Can anyone use the chargers at Jet Propulsion Lab - Passedena - Station 1?
Jet Propulsion Lab - Passedena - Station 1 is listed as by appointment access — check the details before visiting.
Is the Jet Propulsion Lab - Passedena - Station 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
36
55,049 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 55,049 publicly-listed ports in California (31,353 Level 2 and 23,573 DC fast), that works out to roughly 36 EVs per public port and 65.1 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

Details
Hours
Open 24 hours
Network
Non-Networked
Access
By appointment

Last updated · 6 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging