SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
ยฉ 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaSan Jose
CA-350111

ADOBE SAN JOSE WT5 #1

345 Park Ave, San Jose, CA, 95110
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
๐ŸŒImported from open data
๐Ÿ“…Open since 2020
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
โ€”

Finding this location

  • Adobe Employee Use Only!

    Source ยท NREL

Stations & ports

1 station ยท 2 ports
ADOBE SAN JOSE WT5 #1 ยท L2 J1772
ChargePoint Network
AC L2 ยท 7.2 kW
Start session on ChargePoint Network network โ†’
1AJ1772ยท 7.2 kWยท 240V/30A
1BJ1772ยท 7.2 kWยท 240V/30A

Estimated charging time

Level 2 (AC) ยท 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV โ†’

345 Park Ave ยท San Jose, CA ยท 95110

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet โ€” be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is ADOBE SAN JOSE WT5 #1 located?
ADOBE SAN JOSE WT5 #1 is located at 345 Park Ave, San Jose, CA.
What kind of charging does ADOBE SAN JOSE WT5 #1 offer?
ADOBE SAN JOSE WT5 #1 offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at ADOBE SAN JOSE WT5 #1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at ADOBE SAN JOSE WT5 #1. Actual times vary with vehicle, temperature, and station load.
What are ADOBE SAN JOSE WT5 #1's charging hours?
Open 24 hours
What charging network operates ADOBE SAN JOSE WT5 #1?
ADOBE SAN JOSE WT5 #1 is part of the ChargePoint Network network. See more ChargePoint Network charging across CA on SpotCharge.
Can anyone use the chargers at ADOBE SAN JOSE WT5 #1?
Yes โ€” ADOBE SAN JOSE WT5 #1 is a publicly accessible charging location.
Is the ADOBE SAN JOSE WT5 #1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California ยท 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
35.8
55,336 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered โ€” 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 55,336 publicly-listed ports in California (31,384 Level 2 and 23,789 DC fast), that works out to roughly 35.8 EVs per public port and 64.5 BEVs per DC fast port.

California's public charging is keeping pace with adoption โ€” but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) ยท See full California market data โ†’

More charging in San Jose

See all โ†’

Walmart Neighborhood Market #4174

San Jose, CA

DC FastWalmart
2 stations ยท 8 ports400 kW

VARIAN SAN JOSE EV3

San Jose, CA

Level 2ChargePoint Network
1 station ยท 1 port7.2 kW

TG SANJOSE 126C8B

San Jose, CA

Level 2ChargePoint Network
1 station ยท 2 ports7.2 kW

Starbucks - Tesla Supercharger

San Jose, CA

DC FastTesla
1 station ยท 8 ports50 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network โ†—
Access
Public access

Verified by NREL ยท 8 weeks ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fieldsโ–พ

From U.S. DOE AFDC ยท Public domain

id160171
zip95110
citySan Jose
plus4โ€”
stateCA
ng_psiโ€”
cng_psiโ€”
countryUS
latitude37.330755
bd_blendsโ€”
longitude-121.894407
open_date2020-06-12
rd_blendsโ€”
ev_networkChargePoint Network
ev_pricingโ€”
updated_at2026-06-12T01:14:36Z
access_codepublic
cng_has_rngโ€”
lng_has_rngโ€”
lpg_primaryโ€”
status_codeE
bd_blends_frโ€”
hy_is_retailโ€”
hy_pressuresโ€”
hy_standardsโ€”
rd_blends_frโ€”
station_nameADOBE SAN JOSE WT5 #1
ev_other_evseโ€”
ev_pricing_frโ€”
expected_dateโ€”
facility_typeโ€”
nps_unit_nameโ€”
station_phone888-758-4389
cards_acceptedโ€”
ev_dc_fast_numโ€”
ev_network_ids
{
  "posts": [
    "403141",
    "403151"
  ],
  "station": [
    "USCPIL165997"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_linkโ€”
street_address345 Park Ave
funding_sourcesโ€”
owner_type_codeโ€”
access_days_time24 hours daily
e85_blender_pumpโ€”
lpg_nozzle_typesโ€”
ng_vehicle_classโ€”
related_stationsโ€”
cng_dispenser_numโ€”
cng_total_storageโ€”
cng_vehicle_classโ€”
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_classโ€”
ng_fill_type_codeโ€”
restricted_accessNo
access_detail_codeโ€”
cng_fill_type_codeโ€”
ev_connector_typesJ1772
ev_level1_evse_numโ€”
ev_level2_evse_num2
access_days_time_frโ€”
date_last_confirmed2026-06-12
ev_renewable_sourceโ€”
cng_renewable_sourceโ€”
lng_renewable_sourceโ€”
cng_total_compressionโ€”
ev_workplace_chargingNo
maximum_vehicle_classโ€”
rd_max_biodiesel_levelโ€”
groups_with_access_codePublic
intersection_directionsAdobe Employee Use Only!
e85_other_ethanol_blendsโ€”
rd_blended_with_biodieselโ€”
groups_with_access_code_frPublic
intersection_directions_frโ€”
SpotCharge ยท Owner-listed EV charging