SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaFresno
CA-339000

7509 N Willow Ave

7509 N Willow Ave, Fresno, CA, 93720
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
50 kW
DC fast
Ports
3
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

3 stations · 3 ports
7509 N Willow Ave · DCFC CCS
EVCS
DC fast · 50 kW
Start session on EVCS network →
1ACCS· 50 kW· 480V/100A
7509 N Willow Ave · DCFC Tesla
EVCS
DC fast · 50 kW
Start session on EVCS network →
2ATesla· 50 kW· 480V/100A
7509 N Willow Ave · DCFC CHAdeMO
EVCS
DC fast · 50 kW
Start session on EVCS network →
3ACHAdeMO· 50 kW· 480V/100A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

7509 N Willow Ave · Fresno, CA · 93720

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is 7509 N Willow Ave located?
7509 N Willow Ave is located at 7509 N Willow Ave, Fresno, CA.
What kind of charging does 7509 N Willow Ave offer?
7509 N Willow Ave offers DC fast charging, with stations rated up to 50 kW. There are 3 charging stations and 3 total ports at this location.
How long does it take to charge an EV at 7509 N Willow Ave?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging at 7509 N Willow Ave. Actual times vary with vehicle, temperature, and station load.
What are 7509 N Willow Ave's charging hours?
Open 24 hours
What charging network operates 7509 N Willow Ave?
7509 N Willow Ave is part of the EVCS network. See more EVCS charging across CA on SpotCharge.
Can anyone use the chargers at 7509 N Willow Ave?
Yes — 7509 N Willow Ave is a publicly accessible charging location.
Is the 7509 N Willow Ave listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
36
55,049 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 55,049 publicly-listed ports in California (31,353 Level 2 and 23,573 DC fast), that works out to roughly 36 EVs per public port and 65.1 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in Fresno

See all →

THE ROW EV 1

Fresno, CA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

Ellis Enterprises

Fresno, CA

Level 2INTERTIE
1 station · 10 ports7.2 kW

Mallah Inc.

Fresno, CA

DC FastSYNERGEV
2 stations · 4 ports50 kW

Fresno Sequioa Hospital - CN72-07

Fresno, CA

Level 2Blink Network
1 station · 8 ports7.2 kW
Details
Hours
Open 24 hours
Phone
866-300-3827
Network
EVCS ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging