SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaSan Diego
CA-334528

MCRD San Diego / Phase A / Bldg 231

4580 Belleau Ave, San Diego, CA, 92140

MCRD San Diego / Phase A / Bldg 231 is a fed gov in San Diego, CA with 1 Level 2 charging port, not on a charging network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. By appointment. Listing data from NREL, last confirmed December 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Fed gov
Max power
—
AC Level 2
Ports
1
port
Hours
—
Pricing
—

Stations & ports

1 station · 1 port
MCRD San Diego / Phase A / Bldg 231 · L2 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1AJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

4580 Belleau Ave · San Diego, CA · 92140

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is MCRD San Diego / Phase A / Bldg 231 located?
MCRD San Diego / Phase A / Bldg 231 is located at 4580 Belleau Ave, San Diego, CA.
What kind of charging does MCRD San Diego / Phase A / Bldg 231 offer?
MCRD San Diego / Phase A / Bldg 231 offers Level 2 (AC) charging. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at MCRD San Diego / Phase A / Bldg 231?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at MCRD San Diego / Phase A / Bldg 231. Actual times vary with vehicle, temperature, and station load.
Can anyone use the chargers at MCRD San Diego / Phase A / Bldg 231?
MCRD San Diego / Phase A / Bldg 231 is listed as by appointment access — check the details before visiting.
Is the MCRD San Diego / Phase A / Bldg 231 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
—
no port data

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Every EV registered in California is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in San Diego

See all →

HOLOGIC Gen-Probe

San Diego, CA

Level 2Blink
3 stations · 3 ports8.6 kW

QCOM SAN-PAC-AQ-4-4

San Diego, CA

Level 2ChargePoint
1 station · 2 ports6.5 kW

Homewood Suites by Hilton San Diego - Tesla Destination

San Diego, CA

Level 2Tesla Destination
2 stations · 20 ports11 kW

Courtyard by Marriott San Diego Liberty St - Tesla Destination

San Diego, CA

Level 2Tesla Destination
2 stations · 20 ports8 kW
Details
Network
Non-networked
Access
By appointment

Last updated · 9 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging