SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaChula Vista
CA-317973

CHULA VISTA B11 B12

1262 Oleander Ave, Chula Vista, CA, 91911
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2021
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
CHULA VISTA B11 B12 · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1262 Oleander Ave · Chula Vista, CA · 91911

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is CHULA VISTA B11 B12 located?
CHULA VISTA B11 B12 is located at 1262 Oleander Ave, Chula Vista, CA.
What kind of charging does CHULA VISTA B11 B12 offer?
CHULA VISTA B11 B12 offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at CHULA VISTA B11 B12?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at CHULA VISTA B11 B12. Actual times vary with vehicle, temperature, and station load.
What are CHULA VISTA B11 B12's charging hours?
Open 24 hours
What charging network operates CHULA VISTA B11 B12?
CHULA VISTA B11 B12 is part of the ChargePoint Network network. See more ChargePoint Network charging across CA on SpotCharge.
Can anyone use the chargers at CHULA VISTA B11 B12?
Yes — CHULA VISTA B11 B12 is a publicly accessible charging location.
Is the CHULA VISTA B11 B12 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
36
55,049 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 55,049 publicly-listed ports in California (31,353 Level 2 and 23,573 DC fast), that works out to roughly 36 EVs per public port and 65.1 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in Chula Vista

See all →

Silvergate Development

Chula Vista, CA

Level 2DIRT_ROAD
1 station · 18 ports7.2 kW

The Shops at San Miguel Ranch - Tesla Supercharger

Chula Vista, CA

DC FastTesla
1 station · 16 ports50 kW

Luminary at Cota Vera

Chula Vista, CA

Level 2LOOP
1 station · 2 ports7.2 kW

Artisan at the Village of Escaya

Chula Vista, CA

Level 2LOOP
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id175448
zip91911
cityChula Vista
plus4—
stateCA
ng_psi—
cng_psi—
countryUS
latitude32.61773
bd_blends—
longitude-117.034672
open_date2021-01-27
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-06-12T01:44:03Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameCHULA VISTA B11 B12
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "25798871",
    "25798881"
  ],
  "station": [
    "USCPIL2298631"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address1262 Oleander Ave
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-06-12
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging