SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaMcFarland
CA-282192

MCFARLAND EV CPE250

100 Industrial St, McFarland, CA, 93250

MCFARLAND EV CPE250 is an EV charging location in McFarland, CA with 2 DC fast charging ports up to 63 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2021
Max power
62.5 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 2 ports
MCFARLAND EV CPE250 · DCFC CHAdeMO 62.5 kW
ChargePoint Network
DC fast · 62.5 kW

62.5 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACHAdeMO· 62.5 kW
MCFARLAND EV CPE250 · DCFC CCS 62 kW
ChargePoint Network
DC fast · 62 kW

62 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
2ACCS· 62 kW

Estimated charging time

DC fast charging · 62.5 kW
~56 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

100 Industrial St · McFarland, CA · 93250

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is MCFARLAND EV CPE250 located?
MCFARLAND EV CPE250 is located at 100 Industrial St, McFarland, CA.
What kind of charging does MCFARLAND EV CPE250 offer?
MCFARLAND EV CPE250 offers DC fast charging, with stations rated up to 62.5 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at MCFARLAND EV CPE250?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 56 min on 62.5 kW DC fast charging at MCFARLAND EV CPE250. Actual times vary with vehicle, temperature, and station load.
What are MCFARLAND EV CPE250's charging hours?
24 hours daily
What charging network operates MCFARLAND EV CPE250?
MCFARLAND EV CPE250 is part of the ChargePoint network. See more ChargePoint charging across CA on SpotCharge.
Can anyone use the chargers at MCFARLAND EV CPE250?
Yes — MCFARLAND EV CPE250 is a publicly accessible charging location.
Is the MCFARLAND EV CPE250 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
—
no port data

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Every EV registered in California is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More DC fast charging

DC fast charging in McFarland →DC fast charging in California →ChargePoint in California →

More charging in McFarland

See all →

BLUEPATH MJHS EV 1

McFarland, CA

Level 2ChargePoint
1 station · 2 ports6.5 kW

BLUEPATH HORIZON EV 1

McFarland, CA

Level 2ChargePoint
1 station · 1 port6.5 kW

BLUEPATH MHS EV 1

McFarland, CA

Level 2ChargePoint
1 station · 1 port6.5 kW

Famoso Fuel Stop - Tesla Supercharger

McFarland, CA

DC FastTesla
1 station · 8 ports325 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 4 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id202780
zip93250
cityMcFarland
plus4—
stateCA
ng_psi—
cng_psi—
countryUS
latitude35.674953
bd_blends—
longitude-119.225583
open_date2021-12-18
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-16T01:55:45Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameMCFARLAND EV CPE250
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "16444841"
  ],
  "station": [
    "USCPIL9302561"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address100 Industrial St
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 62.5,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 62,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-16
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging