SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaSunnyvale
CA-242385

GOOGLE SVL-CRBN200-52

200 West Caribbean Drive, Sunnyvale, CA, 94089

GOOGLE SVL-CRBN200-52 is an EV charging location in Sunnyvale, CA with 2 Level 2 charging ports up to 7 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2026
Max power
6.5 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • Building 100 Area C - Site (EV 103A/103B)

    Source · NREL

Stations & ports

1 station · 2 ports
GOOGLE SVL-CRBN200-52 · L2 J1772 6.5 kW
ChargePoint Network
AC L2 · 6.5 kW

6.5 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 6.5 kW
1BJ1772· 6.5 kW

Estimated charging time

Level 2 (AC) · 6.5 kW
~8 h 58 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

200 West Caribbean Drive · Sunnyvale, CA · 94089

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is GOOGLE SVL-CRBN200-52 located?
GOOGLE SVL-CRBN200-52 is located at 200 West Caribbean Drive, Sunnyvale, CA.
What kind of charging does GOOGLE SVL-CRBN200-52 offer?
GOOGLE SVL-CRBN200-52 offers Level 2 (AC) charging, with stations rated up to 6.5 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at GOOGLE SVL-CRBN200-52?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 58 min on 6.5 kW Level 2 (AC) charging at GOOGLE SVL-CRBN200-52. Actual times vary with vehicle, temperature, and station load.
What are GOOGLE SVL-CRBN200-52's charging hours?
24 hours daily
What charging network operates GOOGLE SVL-CRBN200-52?
GOOGLE SVL-CRBN200-52 is part of the ChargePoint network. See more ChargePoint charging across CA on SpotCharge.
Can anyone use the chargers at GOOGLE SVL-CRBN200-52?
Yes — GOOGLE SVL-CRBN200-52 is a publicly accessible charging location.
Is the GOOGLE SVL-CRBN200-52 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
32.4
61,051 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 61,051 publicly-listed ports in California (35,123 Level 2 and 25,765 DC fast), that works out to roughly 32.4 EVs per public port and 59.5 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in Sunnyvale

See all →

Sunnyvale, CA - Tesla Destination

Sunnyvale, CA

Level 2Tesla Destination
2 stations · 14 ports7 kW

1250 LAKESIDE LAKESIDE 231

Sunnyvale, CA

Level 2ChargePoint
1 station · 1 port12 kW

1250 LAKESIDE 1250 LAKE 5

Sunnyvale, CA

Level 2ChargePoint
1 station · 1 port12 kW

1250 LAKESIDE LAKESIDE 3

Sunnyvale, CA

Level 2ChargePoint
1 station · 1 port12 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 5 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id465145
zip94089
citySunnyvale
plus4—
stateCA
ng_psi—
cng_psi—
countryUS
latitude37.417356
bd_blends—
longitude-122.019938
open_date2026-07-28
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-15T03:06:22Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameGOOGLE SVL-CRBN200-52
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "27855421",
    "27855431"
  ],
  "station": [
    "USCPIL17852051"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address200 West Caribbean Drive
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-15
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsBuilding 100 Area C - Site (EV 103A/103B)
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging