SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaSan Diego
CA-236714

Makers Quarter - Tesla Destination

1601 Broadway, San Diego, CA, 92101
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2018
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
Makers Quarter - Tesla Destination · L2 J1772
Tesla Destination
AC L2 · 7.2 kW
Start session on Tesla Destination network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1601 Broadway · San Diego, CA · 92101

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Makers Quarter - Tesla Destination located?
Makers Quarter - Tesla Destination is located at 1601 Broadway, San Diego, CA.
What kind of charging does Makers Quarter - Tesla Destination offer?
Makers Quarter - Tesla Destination offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Makers Quarter - Tesla Destination?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Makers Quarter - Tesla Destination. Actual times vary with vehicle, temperature, and station load.
What are Makers Quarter - Tesla Destination's charging hours?
Open 24 hours
What charging network operates Makers Quarter - Tesla Destination?
Makers Quarter - Tesla Destination is part of the Tesla Destination network. See more Tesla Destination charging across CA on SpotCharge.
Can anyone use the chargers at Makers Quarter - Tesla Destination?
Yes — Makers Quarter - Tesla Destination is a publicly accessible charging location.
Is the Makers Quarter - Tesla Destination listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
36
55,049 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 55,049 publicly-listed ports in California (31,353 Level 2 and 23,573 DC fast), that works out to roughly 36 EVs per public port and 65.1 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in San Diego

See all →

San Diego Metropolitan Transit System

San Diego, CA

Level 2FORD_CHARGE
1 station · 2 ports7.2 kW

Ampersand

San Diego, CA

Level 2Blink Network
1 station · 2 ports7.2 kW

San Diego Marriott Mission Valley

San Diego, CA

Level 2EVRANGE
1 station · 4 ports7.2 kW

INTUIT SDG FLOOR 1-8

San Diego, CA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
877-798-3752
Network
Tesla Destination ↗
Access
Public access

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id168942
zip92101
citySan Diego
plus4—
stateCA
ng_psi—
cng_psi—
countryUS
latitude32.715733
bd_blends—
longitude-117.149026
open_date2018-04-29
rd_blends—
ev_networkTesla Destination
ev_pricing—
updated_at2025-02-12T00:16:32Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameMakers Quarter - Tesla Destination
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone877-798-3752
cards_accepted—
ev_dc_fast_num—
ev_network_webhttps://www.tesla.com/destination-charging
fuel_type_codeELEC
geocode_status200-9
hy_status_link—
street_address1601 Broadway
funding_sources—
owner_type_codeP
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Tesla Destination",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 1
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "Tesla Destination",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 1
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_access—
access_detail_code—
cng_fill_type_code—
ev_connector_typesTESLA
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2024-07-01
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging