SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaLong Beach
CA-183816

Artesia Apartments

3101 E Artesia Blvd, Long Beach, CA, 90805
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Other
Max power
7.2 kW
AC Level 2
Ports
70
ports
Hours
24/7
Open 24 hours
Pricing
Tiered pricing
$1 activation fee; $0.45 per kWh

Stations & ports

1 station · 70 ports
Artesia Apartments · L2 J1772
LOOP
AC L2 · 7.2 kW
Start session on LOOP network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A
1EJ1772· 7.2 kW· 240V/30A
1FJ1772· 7.2 kW· 240V/30A
1GJ1772· 7.2 kW· 240V/30A
1HJ1772· 7.2 kW· 240V/30A
1IJ1772· 7.2 kW· 240V/30A
1JJ1772· 7.2 kW· 240V/30A
1KJ1772· 7.2 kW· 240V/30A
1LJ1772· 7.2 kW· 240V/30A
1MJ1772· 7.2 kW· 240V/30A
1NJ1772· 7.2 kW· 240V/30A
1OJ1772· 7.2 kW· 240V/30A
1PJ1772· 7.2 kW· 240V/30A
1QJ1772· 7.2 kW· 240V/30A
1RJ1772· 7.2 kW· 240V/30A
1SJ1772· 7.2 kW· 240V/30A
1TJ1772· 7.2 kW· 240V/30A
1UJ1772· 7.2 kW· 240V/30A
1VJ1772· 7.2 kW· 240V/30A
1WJ1772· 7.2 kW· 240V/30A
1XJ1772· 7.2 kW· 240V/30A
1YJ1772· 7.2 kW· 240V/30A
1ZJ1772· 7.2 kW· 240V/30A
1[J1772· 7.2 kW· 240V/30A
1\J1772· 7.2 kW· 240V/30A
1]J1772· 7.2 kW· 240V/30A
1^J1772· 7.2 kW· 240V/30A
1_J1772· 7.2 kW· 240V/30A
1`J1772· 7.2 kW· 240V/30A
1aJ1772· 7.2 kW· 240V/30A
1bJ1772· 7.2 kW· 240V/30A
1cJ1772· 7.2 kW· 240V/30A
1dJ1772· 7.2 kW· 240V/30A
1eJ1772· 7.2 kW· 240V/30A
1fJ1772· 7.2 kW· 240V/30A
1gJ1772· 7.2 kW· 240V/30A
1hJ1772· 7.2 kW· 240V/30A
1iJ1772· 7.2 kW· 240V/30A
1jJ1772· 7.2 kW· 240V/30A
1kJ1772· 7.2 kW· 240V/30A
1lJ1772· 7.2 kW· 240V/30A
1mJ1772· 7.2 kW· 240V/30A
1nJ1772· 7.2 kW· 240V/30A
1oJ1772· 7.2 kW· 240V/30A
1pJ1772· 7.2 kW· 240V/30A
1qJ1772· 7.2 kW· 240V/30A
1rJ1772· 7.2 kW· 240V/30A
1sJ1772· 7.2 kW· 240V/30A
1tJ1772· 7.2 kW· 240V/30A
1uJ1772· 7.2 kW· 240V/30A
1vJ1772· 7.2 kW· 240V/30A
1wJ1772· 7.2 kW· 240V/30A
1xJ1772· 7.2 kW· 240V/30A
1yJ1772· 7.2 kW· 240V/30A
1zJ1772· 7.2 kW· 240V/30A
1{J1772· 7.2 kW· 240V/30A
1|J1772· 7.2 kW· 240V/30A
1}J1772· 7.2 kW· 240V/30A
1~J1772· 7.2 kW· 240V/30A
1J1772· 7.2 kW· 240V/30A
1€J1772· 7.2 kW· 240V/30A
1J1772· 7.2 kW· 240V/30A
1‚J1772· 7.2 kW· 240V/30A
1ƒJ1772· 7.2 kW· 240V/30A
1„J1772· 7.2 kW· 240V/30A
1…J1772· 7.2 kW· 240V/30A
1†J1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

3101 E Artesia Blvd · Long Beach, CA · 90805

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Artesia Apartments located?
Artesia Apartments is located at 3101 E Artesia Blvd, Long Beach, CA.
What kind of charging does Artesia Apartments offer?
Artesia Apartments offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 70 total ports at this location.
How long does it take to charge an EV at Artesia Apartments?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Artesia Apartments. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Artesia Apartments?
$1 activation fee; $0.45 per kWh
What are Artesia Apartments's charging hours?
Open 24 hours
What charging network operates Artesia Apartments?
Artesia Apartments is part of the LOOP network. See more LOOP charging across CA on SpotCharge.
Can anyone use the chargers at Artesia Apartments?
Yes — Artesia Apartments is a publicly accessible charging location.
Is the Artesia Apartments listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
36
55,049 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 55,049 publicly-listed ports in California (31,353 Level 2 and 23,573 DC fast), that works out to roughly 36 EVs per public port and 65.1 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in Long Beach

See all →

NOT FOR PUBLIC USE - TEST LAB

Long Beach, CA

DC FastMERCEDES_BENZ
2 stations · 2 ports50 kW

180 E OCEAN EVC 02

Long Beach, CA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

The Cove (Long Beach, CA)

Long Beach, CA

DC FastElectrify America
1 station · 8 ports50 kW

LONG BEACH PWPS TRAILER 3

Long Beach, CA

DC FastChargePoint Network
2 stations · 2 ports50 kW
Details
Hours
Open 24 hours
Pricing
$1 activation fee; $0.45 per kWh
Phone
888-385-6671
Network
LOOP ↗
Access
Public access

Last updated · 3 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging