SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaYosemite West
CA-136480

Yosemite National Park - Yosemite Lodge

7590 Dogwood Ln, Yosemite West, CA, 95389
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Natl park
Max power
7.2 kW
AC Level 2
Ports
4
ports
Hours
24/7
Open 24 hours
Pricing
Free
Free

Stations & ports

1 station · 4 ports
Yosemite National Park - Yosemite Lodge · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

7590 Dogwood Ln · Yosemite West, CA · 95389

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Yosemite National Park - Yosemite Lodge located?
Yosemite National Park - Yosemite Lodge is located at 7590 Dogwood Ln, Yosemite West, CA.
What kind of charging does Yosemite National Park - Yosemite Lodge offer?
Yosemite National Park - Yosemite Lodge offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 4 total ports at this location.
How long does it take to charge an EV at Yosemite National Park - Yosemite Lodge?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Yosemite National Park - Yosemite Lodge. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Yosemite National Park - Yosemite Lodge?
Free
What are Yosemite National Park - Yosemite Lodge's charging hours?
Open 24 hours
What charging network operates Yosemite National Park - Yosemite Lodge?
Yosemite National Park - Yosemite Lodge is part of the Non-Networked network. See more Non-Networked charging across CA on SpotCharge.
Can anyone use the chargers at Yosemite National Park - Yosemite Lodge?
Yes — Yosemite National Park - Yosemite Lodge is a publicly accessible charging location.
Is the Yosemite National Park - Yosemite Lodge listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
36
55,049 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 55,049 publicly-listed ports in California (31,353 Level 2 and 23,573 DC fast), that works out to roughly 36 EVs per public port and 65.1 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

Details
Hours
Open 24 hours
Pricing
Free
Phone
888-413-8869
Network
Non-Networked
Access
Public access

Data from NREL

SpotCharge · Owner-listed EV charging