SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaDavis
CA-115257

University of California - Davis Extension - Lot 80

1441 Research Park Dr, Davis, CA, 95616

University of California - Davis Extension - Lot 80 is a college campus in Davis, CA with 4 Level 2 charging ports, not on a charging network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Pricing: Parking fee. 24 hours daily; parking pass required; Drivers must bring their own J1772 cordset for Level 1 charging. Public access. Listing data from NREL, last refreshed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍College campus
📅Open since 2004
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
4
ports
Hours
24/7
24 hours daily; parking pass required; Drivers must bring their own J1772 cordset for Level 1 charging
Pricing
Parking fee
Parking fee

Stations & ports

2 stations · 4 ports
University of California - Davis Extension - Lot 80 · L2 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1AJ1772
1BJ1772
1CJ1772
University of California - Davis Extension - Lot 80 · L1 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

2AJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1441 Research Park Dr · Davis, CA · 95616

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is University of California - Davis Extension - Lot 80 located?
University of California - Davis Extension - Lot 80 is located at 1441 Research Park Dr, Davis, CA.
What kind of charging does University of California - Davis Extension - Lot 80 offer?
University of California - Davis Extension - Lot 80 offers Level 2 (AC) charging. There are 2 charging stations and 4 total ports at this location.
How long does it take to charge an EV at University of California - Davis Extension - Lot 80?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at University of California - Davis Extension - Lot 80. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at University of California - Davis Extension - Lot 80?
Parking fee
What are University of California - Davis Extension - Lot 80's charging hours?
24 hours daily; parking pass required; Drivers must bring their own J1772 cordset for Level 1 charging
Can anyone use the chargers at University of California - Davis Extension - Lot 80?
Yes — University of California - Davis Extension - Lot 80 is a publicly accessible charging location. NREL lists it as reserved for patrons of the business.
Is the University of California - Davis Extension - Lot 80 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
32.4
61,055 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 61,055 publicly-listed ports in California (35,127 Level 2 and 25,765 DC fast), that works out to roughly 32.4 EVs per public port and 59.5 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in Davis

See all →

TERAPROPLLC DAVIS CHIPOTLE2

Davis, CA

Level 2ChargePoint
1 station · 2 ports6.5 kW

DJUSD EV 1

Davis, CA

Level 2ChargePoint
1 station · 2 ports6.5 kW

Holiday Inn Express

Davis, CA

Level 2AmpUp
1 station · 2 ports

University Mall - Tesla Supercharger

Davis, CA

DC FastTesla
1 station · 20 ports325 kW
Details
Hours
24 hours daily; parking pass required; Drivers must bring their own J1772 cordset for Level 1 charging
Pricing
Parking fee
Phone
530-752-8277
Network
Non-networked
Access
Public access
Reserved for patrons of the business · From NREL
Ownership
State government
From NREL

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id21673
zip95616
cityDavis
plus4—
stateCA
ng_psi—
cng_psi—
countryUS
latitude38.539336
bd_blends—
longitude-121.732405
open_date2004-06-01
rd_blends—
ev_networkNon-Networked
ev_pricingParking fee
updated_at2025-05-07T15:59:42Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameUniversity of California - Davis Extension - Lot 80
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeCOLLEGE_CAMPUS
nps_unit_name—
station_phone530-752-8277
cards_accepted—
ev_dc_fast_num—
ev_network_web—
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address1441 Research Park Dr
funding_sources—
owner_type_codeSG
access_days_time24 hours daily; parking pass required; Drivers must bring their own J1772 cordset for Level 1 charging
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 1
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "1",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessYes
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772, NEMA520
ev_level1_evse_num1
ev_level2_evse_num3
access_days_time_fr—
date_last_confirmed2023-01-10
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging