SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaBrawley
CA-092635

SDSU Brawley

560 CA-78, Brawley, CA, 92227
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
50 kW
DC fast
Ports
7
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

2 stations · 7 ports
SDSU Brawley · L2 J1772
DIRT_ROAD
AC L2 · 7.2 kW
Start session on DIRT_ROAD network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A
1EJ1772· 7.2 kW· 240V/30A
SDSU Brawley · DCFC CCS
DIRT_ROAD
DC fast · 50 kW
Start session on DIRT_ROAD network →
2ACCS· 50 kW· 480V/100A
2BCCS· 50 kW· 480V/100A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min
Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

560 CA-78 · Brawley, CA · 92227

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is SDSU Brawley located?
SDSU Brawley is located at 560 CA-78, Brawley, CA.
What kind of charging does SDSU Brawley offer?
SDSU Brawley offers DC fast charging and Level 2 (AC) charging, with stations rated up to 50 kW. There are 2 charging stations and 7 total ports at this location.
How long does it take to charge an EV at SDSU Brawley?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging, or about 8 h 6 min on 7.2 kW Level 2 (AC) charging at SDSU Brawley. Actual times vary with vehicle, temperature, and station load.
What are SDSU Brawley's charging hours?
Open 24 hours
What charging network operates SDSU Brawley?
SDSU Brawley is part of the DIRT_ROAD network. See more DIRT_ROAD charging across CA on SpotCharge.
Can anyone use the chargers at SDSU Brawley?
Yes — SDSU Brawley is a publicly accessible charging location.
Is the SDSU Brawley listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
36
55,049 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 55,049 publicly-listed ports in California (31,353 Level 2 and 23,573 DC fast), that works out to roughly 36 EVs per public port and 65.1 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in Brawley

See all →

COMITE CIVICO CCV EV CHARGER

Brawley, CA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

Rio Vista Plaza Shopping Center - Brawley, CA

Brawley, CA

DC FasteVgo Network
2 stations · 6 ports350 kW

Comite Civico del Valle

Brawley, CA

DC FastEVRANGE
1 station · 4 ports180 kW
Details
Hours
Open 24 hours
Phone
888-401-3738
Network
DIRT_ROAD ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging