SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaGlendale
CA-065625

Maia Avira at Glendale

111 North Louise Street, Glendale, CA, 91206

Maia Avira at Glendale is an EV charging location in Glendale, CA with 2 Level 2 charging ports up to 12 kW on the Blink network. 24 hours daily. Public access. Listing data from NREL, last confirmed November 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2026
Max power
11.5 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 2 ports
Maia Avira at Glendale · L2 J1772 11.5 kW
Blink Network
AC L2 · 11.5 kW

11.5 kW adds roughly 40 miles of range per hour for a typical EV.

Start session on Blink Network network →
1AJ1772· 11.5 kW
Maia Avira at Glendale · L2 J1772 10 kW
Blink Network
AC L2 · 10 kW

10 kW adds roughly 35 miles of range per hour for a typical EV.

Start session on Blink Network network →
2AJ1772· 10 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

111 North Louise Street · Glendale, CA · 91206

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Maia Avira at Glendale located?
Maia Avira at Glendale is located at 111 North Louise Street, Glendale, CA.
What kind of charging does Maia Avira at Glendale offer?
Maia Avira at Glendale offers Level 2 (AC) charging, with stations rated up to 11.5 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at Maia Avira at Glendale?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at Maia Avira at Glendale. Actual times vary with vehicle, temperature, and station load.
What are Maia Avira at Glendale's charging hours?
24 hours daily
What charging network operates Maia Avira at Glendale?
Maia Avira at Glendale is part of the Blink network. See more Blink charging across CA on SpotCharge.
Can anyone use the chargers at Maia Avira at Glendale?
Yes — Maia Avira at Glendale is a publicly accessible charging location.
Is the Maia Avira at Glendale listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
31.4
63,059 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 63,059 publicly-listed ports in California (36,049 Level 2 and 26,847 DC fast), that works out to roughly 31.4 EVs per public port and 57.1 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in Glendale

See all →

GLENDALE CC GARFIELD 3

Glendale, CA

Level 2ChargePoint
1 station · 1 port6.5 kW

GLENDALE CC GLENDALE CC3

Glendale, CA

Level 2ChargePoint
1 station · 2 ports6.5 kW

GLENDALE CC GLENDALE CC1

Glendale, CA

Level 2ChargePoint
1 station · 2 ports6.5 kW

DWFV 101 ELLSWO EV BAY 3&4

Glendale, CA

Level 2ChargePoint
1 station · 2 ports6.5 kW
Details
Hours
24 hours daily
Phone
888-998-2546
Network
Blink ↗
Access
Public access

Verified by NREL · 1 day ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center76 fields▾

From U.S. DOE AFDC · Public domain

id466377
zip91206
cityGlendale
plus4—
stateCA
ng_psi—
cng_psi—
countryUS
latitude34.14716518587467
bd_blends—
longitude-118.2529480945358
open_date2026-08-19
rd_blends—
ev_networkBlink Network
ev_pricing—
unverifiedNo
updated_at2026-11-03T00:23:48Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameMaia Avira at Glendale
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-998-2546
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "24821687-f8cf-48a2-a43e-bb5e978310c2",
    "eff9c14c-eb68-45bb-bed9-1ffff613cb60"
  ],
  "station": [
    "4ae1227b-314a-4e7b-96ba-2df3da0484fd"
  ]
}
ev_network_webhttps://blinkcharging.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address111 North Louise Street
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Blink Network",
    "connectors": {
      "J1772": {
        "power_kw": 10,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "Blink Network",
    "connectors": {
      "J1772": {
        "power_kw": 11.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-11-03
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging