SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaGardena
CA-023430

BTEC

14904 S Figueroa St, Gardena, CA, 90248
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏢Office building
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
Tiered pricing
$1 activation fee; $0.45 per kWh

Stations & ports

1 station · 2 ports
BTEC · L2 J1772
LOOP
AC L2 · 7.2 kW
Start session on LOOP network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

14904 S Figueroa St · Gardena, CA · 90248

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is BTEC located?
BTEC is located at 14904 S Figueroa St, Gardena, CA.
What kind of charging does BTEC offer?
BTEC offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at BTEC?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at BTEC. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at BTEC?
$1 activation fee; $0.45 per kWh
What are BTEC's charging hours?
Open 24 hours
What charging network operates BTEC?
BTEC is part of the LOOP network. See more LOOP charging across CA on SpotCharge.
Can anyone use the chargers at BTEC?
Yes — BTEC is a publicly accessible charging location.
Is the BTEC listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
36
55,049 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 55,049 publicly-listed ports in California (31,353 Level 2 and 23,573 DC fast), that works out to roughly 36 EVs per public port and 65.1 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More charging in Gardena

See all →

879 W 190th St

Gardena, CA

Level 2EV Connect
1 station · 6 ports7.2 kW

PD Parking Lot

Gardena, CA

Level 2NOODOE
1 station · 18 ports7.2 kW

CSG EV CARSOCORYDE#1,2

Gardena, CA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

Structural Focus - Tesla Destination

Gardena, CA

Level 2Tesla Destination
1 station · 1 port7.2 kW
Details
Hours
Open 24 hours
Pricing
$1 activation fee; $0.45 per kWh
Phone
888-385-6671
Network
LOOP ↗
Access
Public access

Last updated · 3 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging