SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaMonterey
CA-015137

US Bank Monterey

1400 Munras Ave, Monterey, CA, 93940

US Bank Monterey is an EV charging location in Monterey, CA with 4 DC fast charging ports up to 50 kW on the EVCS network. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2023
Max power
50 kW
DC fast
Ports
4
ports
Hours
—
Pricing
—

Stations & ports

2 stations · 4 ports
US Bank Monterey · DCFC CCS 50 kW
EVCS
DC fast · 50 kW

50 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on EVCS network →
1ACCS· 50 kW
1BCCS· 50 kW
US Bank Monterey · DCFC CHAdeMO 50 kW
EVCS
DC fast · 50 kW

50 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on EVCS network →
2ACHAdeMO· 50 kW
2BCHAdeMO· 50 kW

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1400 Munras Ave · Monterey, CA · 93940

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is US Bank Monterey located?
US Bank Monterey is located at 1400 Munras Ave, Monterey, CA.
What kind of charging does US Bank Monterey offer?
US Bank Monterey offers DC fast charging, with stations rated up to 50 kW. There are 2 charging stations and 4 total ports at this location.
How long does it take to charge an EV at US Bank Monterey?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging at US Bank Monterey. Actual times vary with vehicle, temperature, and station load.
What charging network operates US Bank Monterey?
US Bank Monterey is part of the EVCS network. See more EVCS charging across CA on SpotCharge.
Can anyone use the chargers at US Bank Monterey?
Yes — US Bank Monterey is a publicly accessible charging location.
Is the US Bank Monterey listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
—
no port data

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Every EV registered in California is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More DC fast charging

DC fast charging in Monterey →DC fast charging in California →EVCS in California →

More charging in Monterey

See all →

NEX NSA Monterey

Monterey, CA

Level 2
1 station · 4 ports

NSA MONTEREY / N62271-B426-3

Monterey, CA

Level 2
1 station · 2 ports

Del Monte Shopping Center

Monterey, CA

Level 2Blink
2 stations · 2 ports11.5 kW

Hyatt Regency Monterey Hotel and Spa - Tesla Destination

Monterey, CA

Level 2Tesla Destination
1 station · 2 ports8 kW

Plan a trip around here

This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.

Monterey & Big Sur →All California destinations →
Details
Phone
866-300-3827
Network
EVCS ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id348868
zip93940
cityMonterey
plus4—
stateCA
ng_psi—
cng_psi—
countryUS
latitude36.5831983
bd_blends—
longitude-121.9024298
open_date2023-08-28
rd_blends—
ev_networkEVCS
ev_pricing—
updated_at2026-09-18T05:09:03Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameUS Bank Monterey
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone866-300-3827
cards_accepted—
ev_dc_fast_num2
ev_network_ids
{
  "posts": [
    "67527935a1748f9d94f715ef",
    "67527981a1748f9d94f717d9"
  ],
  "station": [
    "673bc918920c8c0a1c971b84"
  ]
}
ev_network_webhttps://www.evcs.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address1400 Munras Ave
funding_sources—
owner_type_code—
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "EVCS",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 50,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 50,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "EVCS",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 50,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 50,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging