SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaSan Jose
CA-013520

CHARGEPOINT ZNKR DC 1

2191 Zanker Road, San Jose, CA, 95131

CHARGEPOINT ZNKR DC 1 is an EV charging location in San Jose, CA with 2 DC fast charging ports up to 62 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2023
Max power
62 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 2 ports
CHARGEPOINT ZNKR DC 1 · DCFC CCS 62 kW
ChargePoint Network
DC fast · 62 kW

62 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACCS· 62 kW
CHARGEPOINT ZNKR DC 1 · DCFC Tesla 62 kW
ChargePoint Network
DC fast · 62 kW

62 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
2ATesla· 62 kW

Estimated charging time

DC fast charging · 62 kW
~56 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2191 Zanker Road · San Jose, CA · 95131

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is CHARGEPOINT ZNKR DC 1 located?
CHARGEPOINT ZNKR DC 1 is located at 2191 Zanker Road, San Jose, CA.
What kind of charging does CHARGEPOINT ZNKR DC 1 offer?
CHARGEPOINT ZNKR DC 1 offers DC fast charging, with stations rated up to 62 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at CHARGEPOINT ZNKR DC 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 56 min on 62 kW DC fast charging at CHARGEPOINT ZNKR DC 1. Actual times vary with vehicle, temperature, and station load.
What are CHARGEPOINT ZNKR DC 1's charging hours?
24 hours daily
What charging network operates CHARGEPOINT ZNKR DC 1?
CHARGEPOINT ZNKR DC 1 is part of the ChargePoint network. See more ChargePoint charging across CA on SpotCharge.
Can anyone use the chargers at CHARGEPOINT ZNKR DC 1?
Yes — CHARGEPOINT ZNKR DC 1 is a publicly accessible charging location.
Is the CHARGEPOINT ZNKR DC 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
32.4
61,055 ports listed

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Across 61,055 publicly-listed ports in California (35,127 Level 2 and 25,765 DC fast), that works out to roughly 32.4 EVs per public port and 59.5 BEVs per DC fast port.

California's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More DC fast charging

DC fast charging in San Jose →DC fast charging in California →ChargePoint in California →

More charging in San Jose

See all →

Market Square

San Jose, CA

Level 2
1 station · 2 ports

MBSJ FRONT SERVICE

San Jose, CA

Level 2ChargePoint
1 station · 2 ports6.5 kW

San Jose, CA - North 1st Street - Tesla Destination

San Jose, CA

Level 2Tesla Destination
2 stations · 8 ports10 kW

Republic - Tesla Destination

San Jose, CA

Level 2Tesla Destination
2 stations · 8 ports7 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id259638
zip95131
citySan Jose
plus4—
stateCA
ng_psi—
cng_psi—
countryUS
latitude37.37999
bd_blends—
longitude-121.916579
open_date2023-04-20
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-18T02:24:28Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameCHARGEPOINT ZNKR DC 1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "23013131"
  ],
  "station": [
    "USCPIL13623991"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address2191 Zanker Road
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": 62,
        "port_count": 1
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 62,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772COMBO, TESLA
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging