SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsCaliforniaFresno
CA-013338

CHEVRON JQ SHAWHAYES DC1

5979 W Shaw Ave, Fresno, CA, 93722

CHEVRON JQ SHAWHAYES DC1 is an EV charging location in Fresno, CA with 2 DC fast charging ports up to 125 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2022
Max power
125 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • At the chevron in the parking lot

    Source · NREL

Stations & ports

2 stations · 2 ports
CHEVRON JQ SHAWHAYES DC1 · DCFC CCS 125 kW
ChargePoint Network
DC fast · 125 kW

125 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACCS· 125 kW
CHEVRON JQ SHAWHAYES DC1 · DCFC CHAdeMO 125 kW
ChargePoint Network
DC fast · 125 kW

125 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
2ACHAdeMO· 125 kW

Estimated charging time

DC fast charging · 125 kW
~28 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

5979 W Shaw Ave · Fresno, CA · 93722

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is CHEVRON JQ SHAWHAYES DC1 located?
CHEVRON JQ SHAWHAYES DC1 is located at 5979 W Shaw Ave, Fresno, CA.
What kind of charging does CHEVRON JQ SHAWHAYES DC1 offer?
CHEVRON JQ SHAWHAYES DC1 offers DC fast charging, with stations rated up to 125 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at CHEVRON JQ SHAWHAYES DC1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 28 min on 125 kW DC fast charging at CHEVRON JQ SHAWHAYES DC1. Actual times vary with vehicle, temperature, and station load.
What are CHEVRON JQ SHAWHAYES DC1's charging hours?
24 hours daily
What charging network operates CHEVRON JQ SHAWHAYES DC1?
CHEVRON JQ SHAWHAYES DC1 is part of the ChargePoint network. See more ChargePoint charging across CA on SpotCharge.
Can anyone use the chargers at CHEVRON JQ SHAWHAYES DC1?
Yes — CHEVRON JQ SHAWHAYES DC1 is a publicly accessible charging location.
Is the CHEVRON JQ SHAWHAYES DC1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

California · 2024
Plug-in vehicles
1.98M
#1 in US
Battery-electric
1.53M
77% of fleet
EVs per public port
—
no port data

As of 2024, California had 1,981,000 plug-in vehicles registered — 1,533,900 fully battery-electric (77%) and 447,100 plug-in hybrid (23%). That ranks California #1 nationally and represents about 32.9% of all US plug-in registrations.

Every EV registered in California is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full California market data →

More DC fast charging

DC fast charging in Fresno →DC fast charging in California →ChargePoint in California →

More charging in Fresno

See all →

Walmart EV Charging

Fresno, CA

DC FastWalmart
2 stations · 8 ports400 kW

Arco Plaza - Tesla Supercharger

Fresno, CA

DC FastTesla
1 station · 16 ports500 kW

Fairfield Inn & Suites Fresno Yosemite International Airport - Tesla Destination

Fresno, CA

Level 2Tesla Destination
2 stations · 12 ports

Fresno, CA - N Chestnut Ave - Tesla Supercharger

Fresno, CA

DC FastTesla
1 station · 32 ports325 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 3 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id231758
zip93722
cityFresno
plus4—
stateCA
ng_psi—
cng_psi—
countryUS
latitude36.807726
bd_blends—
longitude-119.898298
open_date2022-10-04
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-17T02:04:55Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameCHEVRON JQ SHAWHAYES DC1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "22430571"
  ],
  "station": [
    "USCPIL13113101"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address5979 W Shaw Ave
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 125,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 125,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-17
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsAt the chevron in the parking lot
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging