SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsArizonaGilbert
AZ-668840

The Tyler Apartments

3150 E Ray Rd, Gilbert, AZ, 85296
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
5
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 5 ports
The Tyler Apartments · L2 J1772
CHARGELAB
AC L2 · 7.2 kW
Start session on CHARGELAB network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A
1EJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

3150 E Ray Rd · Gilbert, AZ · 85296

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is The Tyler Apartments located?
The Tyler Apartments is located at 3150 E Ray Rd, Gilbert, AZ.
What kind of charging does The Tyler Apartments offer?
The Tyler Apartments offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 5 total ports at this location.
How long does it take to charge an EV at The Tyler Apartments?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at The Tyler Apartments. Actual times vary with vehicle, temperature, and station load.
What are The Tyler Apartments's charging hours?
Open 24 hours
What charging network operates The Tyler Apartments?
The Tyler Apartments is part of the CHARGELAB network. See more CHARGELAB charging across AZ on SpotCharge.
Can anyone use the chargers at The Tyler Apartments?
Yes — The Tyler Apartments is a publicly accessible charging location.
Is the The Tyler Apartments listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Arizona · 2024
Plug-in vehicles
141K
#11 in US
Battery-electric
111K
79% of fleet
EVs per public port
33.2
4,229 ports listed

As of 2024, Arizona had 140,500 plug-in vehicles registered — 111,200 fully battery-electric (79%) and 29,300 plug-in hybrid (21%). That ranks Arizona #11 nationally and represents about 2.3% of all US plug-in registrations.

Across 4,229 publicly-listed ports in Arizona (2,404 Level 2 and 1,820 DC fast), that works out to roughly 33.2 EVs per public port and 61.1 BEVs per DC fast port.

Arizona's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Arizona market data →

More charging in Gilbert

See all →

LIV COMMUNITIES NORTHGATE ST2

Gilbert, AZ

Level 2ChargePoint Network
1 station · 1 port7.2 kW

LIV COMMUNITIES NORTGATE ST1

Gilbert, AZ

Level 2ChargePoint Network
1 station · 1 port7.2 kW

Gilbert Crossing - Tesla Supercharger

Gilbert, AZ

DC FastTesla
1 station · 16 ports50 kW

The Atwood at Rivulon

Gilbert, AZ

Level 2NOODOE
1 station · 12 ports7.2 kW
Details
Hours
Open 24 hours
Phone
800-636-0986
Network
CHARGELAB ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging