SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsArkansasWalnut Ridge
AR-596821

City of Walnut Ridge Abbey Road

110 Abbey Rd, Walnut Ridge, AR, 72476

City of Walnut Ridge Abbey Road is a government in Walnut Ridge, AR with 2 Level 2 charging ports up to 12 kW on the ChargePoint network. Charging is free. 24 hours daily. Public access. Listing data from NREL, last confirmed June 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏛️Government
📅Open since 2022
🚚Fits Light-duty (cars, SUVs)
Max power
11.5 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
Free
Free

Stations & ports

1 station · 2 ports
City of Walnut Ridge Abbey Road · L2 J1772 11.5 kW
ChargePoint Network
AC L2 · 11.5 kW

11.5 kW adds roughly 40 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 11.5 kW
1BJ1772· 11.5 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

110 Abbey Rd · Walnut Ridge, AR · 72476

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is City of Walnut Ridge Abbey Road located?
City of Walnut Ridge Abbey Road is located at 110 Abbey Rd, Walnut Ridge, AR.
What kind of charging does City of Walnut Ridge Abbey Road offer?
City of Walnut Ridge Abbey Road offers Level 2 (AC) charging, with stations rated up to 11.5 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at City of Walnut Ridge Abbey Road?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at City of Walnut Ridge Abbey Road. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at City of Walnut Ridge Abbey Road?
Free
What are City of Walnut Ridge Abbey Road's charging hours?
24 hours daily
What charging network operates City of Walnut Ridge Abbey Road?
City of Walnut Ridge Abbey Road is part of the ChargePoint network. See more ChargePoint charging across AR on SpotCharge.
Can anyone use the chargers at City of Walnut Ridge Abbey Road?
Yes — City of Walnut Ridge Abbey Road is a publicly accessible charging location.
Is the City of Walnut Ridge Abbey Road listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Arkansas · 2024
Plug-in vehicles
13K
#44 in US
Battery-electric
9.5K
71% of fleet
EVs per public port
10.4
1,273 ports listed

As of 2024, Arkansas had 13,300 plug-in vehicles registered — 9,500 fully battery-electric (71%) and 3,800 plug-in hybrid (29%). That ranks Arkansas #44 nationally and represents about 0.2% of all US plug-in registrations.

Across 1,273 publicly-listed ports in Arkansas (783 Level 2 and 490 DC fast), that works out to roughly 10.4 EVs per public port and 19.4 BEVs per DC fast port.

Arkansas has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Arkansas drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Arkansas market data →

More charging in Walnut Ridge

See all →

Beatles Park

Walnut Ridge, AR

Level 2
1 station · 2 ports7 kW
Details
Hours
24 hours daily
Pricing
Free
Phone
870-886-6638
Network
ChargePoint ↗
Access
Public access
Ownership
Privately owned
From NREL

Verified by NREL · 16 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id240994
zip72476
cityWalnut Ridge
plus4—
stateAR
ng_psi—
cng_psi—
countryUS
latitude36.07118803144895
bd_blends—
longitude-90.9577751497376
open_date2022-10-01
rd_blends—
ev_networkChargePoint Network
ev_pricingFree
updated_at2026-02-02T23:16:24Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameCity of Walnut Ridge Abbey Road
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeMUNI_GOV
nps_unit_name—
station_phone870-886-6638
cards_accepted—
ev_dc_fast_num—
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address110 Abbey Rd
funding_sources—
owner_type_codeP
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 11.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 11.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2025-06-06
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging