SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsArkansasFort Smith
AR-130523

Gerdau Fort Smith Mill

5225 Planters Rd, Fort Smith, AR, 72916
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Factory
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
Gerdau Fort Smith Mill · L2 J1772
AMPUP
AC L2 · 7.2 kW
Start session on AMPUP network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

5225 Planters Rd · Fort Smith, AR · 72916

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Gerdau Fort Smith Mill located?
Gerdau Fort Smith Mill is located at 5225 Planters Rd, Fort Smith, AR.
What kind of charging does Gerdau Fort Smith Mill offer?
Gerdau Fort Smith Mill offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Gerdau Fort Smith Mill?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Gerdau Fort Smith Mill. Actual times vary with vehicle, temperature, and station load.
What are Gerdau Fort Smith Mill's charging hours?
Open 24 hours
What charging network operates Gerdau Fort Smith Mill?
Gerdau Fort Smith Mill is part of the AMPUP network. See more AMPUP charging across AR on SpotCharge.
Can anyone use the chargers at Gerdau Fort Smith Mill?
Gerdau Fort Smith Mill is listed as by appointment access — check the details before visiting.
Is the Gerdau Fort Smith Mill listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Arkansas · 2024
Plug-in vehicles
13K
#44 in US
Battery-electric
9.5K
71% of fleet
EVs per public port
13.6
979 ports listed

As of 2024, Arkansas had 13,300 plug-in vehicles registered — 9,500 fully battery-electric (71%) and 3,800 plug-in hybrid (29%). That ranks Arkansas #44 nationally and represents about 0.2% of all US plug-in registrations.

Across 979 publicly-listed ports in Arkansas (628 Level 2 and 351 DC fast), that works out to roughly 13.6 EVs per public port and 27.1 BEVs per DC fast port.

Arkansas has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Arkansas drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Arkansas market data →

More charging in Fort Smith

See all →

TOTAL REHAB TOTAL REHAB

Fort Smith, AR

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

Harry Robinson Buick-GMC

FORT SMITH, AR

DC FastLevel 2EV Connect
2 stations · 3 ports50 kW

OBE CRTYARD FSMIT L

Fort Smith, AR

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

Orr Cadillac

Fort Smith, AR

DC FastLevel 2EV Connect
2 stations · 3 ports50 kW
Details
Hours
Open 24 hours
Network
AMPUP ↗
Access
By appointment

Data from NREL

SpotCharge · Owner-listed EV charging