305 Clinton Dr Building B Unit 1
Juneau, AK
Downtown Transit Center is a pay garage in Juneau, AK with 1 DC fast charging port up to 50 kW, not on a charging network. Charging is free. 24 hours daily. Public access. Listing data from NREL, last refreshed September 2026.
Main Street and Egan Drive
Source · NREL
50 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.
For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →
No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.
Charged here? Tell the next driver how it went:
No reviews yet — be the first to charge here and share your experience.
As of 2024, Alaska had 4,500 plug-in vehicles registered — 3,400 fully battery-electric (76%) and 1,100 plug-in hybrid (24%). That ranks Alaska #48 nationally and represents about 0.1% of all US plug-in registrations.
Across 305 publicly-listed ports in Alaska (115 Level 2 and 190 DC fast), that works out to roughly 14.8 EVs per public port and 17.9 BEVs per DC fast port.
Alaska has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Alaska drivers switch to electric.
Source: AFDC (data from Experian Information Solutions) · See full Alaska market data →
Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.
From U.S. DOE AFDC · Public domain
| id | 117440 |
|---|---|
| zip | 99801 |
| city | Juneau |
| plus4 | — |
| state | AK |
| ng_psi | — |
| cng_psi | — |
| country | US |
| latitude | 58.300164 |
| bd_blends | — |
| longitude | -134.40846 |
| open_date | 2018-11-15 |
| rd_blends | — |
| ev_network | Non-Networked |
| ev_pricing | Free |
| updated_at | 2025-05-29T13:12:02Z |
| access_code | public |
| cng_has_rng | — |
| lng_has_rng | — |
| lpg_primary | — |
| status_code | E |
| bd_blends_fr | — |
| hy_is_retail | — |
| hy_pressures | — |
| hy_standards | — |
| rd_blends_fr | — |
| station_name | Downtown Transit Center |
| ev_other_evse | — |
| ev_pricing_fr | — |
| expected_date | — |
| facility_type | PAY_GARAGE |
| nps_unit_name | — |
| station_phone | 907-586-5226 |
| cards_accepted | — |
| ev_dc_fast_num | 1 |
| ev_network_web | — |
| fuel_type_code | ELEC |
| geocode_status | 200-8 |
| hy_status_link | — |
| street_address | 100 Main St |
| funding_sources | — |
| owner_type_code | LG |
| access_days_time | 24 hours daily |
| e85_blender_pump | — |
| lpg_nozzle_types | — |
| ng_vehicle_class | — |
| related_stations | — |
| cng_dispenser_num | — |
| cng_total_storage | — |
| cng_vehicle_class | — |
| ev_charging_units | [
{
"network": "Non-Networked",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 0
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": 50,
"port_count": 1
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": null,
"port_count": 0
}
},
"port_count": 1,
"charging_level": "dc_fast",
"funding_sources": []
}
] |
| lng_vehicle_class | — |
| ng_fill_type_code | — |
| restricted_access | No |
| access_detail_code | — |
| cng_fill_type_code | — |
| ev_connector_types | CHADEMO |
| ev_level1_evse_num | — |
| ev_level2_evse_num | — |
| access_days_time_fr | — |
| date_last_confirmed | 2024-06-13 |
| ev_renewable_source | — |
| cng_renewable_source | — |
| lng_renewable_source | — |
| cng_total_compression | — |
| ev_workplace_charging | No |
| maximum_vehicle_class | LD |
| rd_max_biodiesel_level | — |
| groups_with_access_code | Public |
| intersection_directions | Main Street and Egan Drive |
| e85_other_ethanol_blends | — |
| rd_blended_with_biodiesel | — |
| groups_with_access_code_fr | Public |
| intersection_directions_fr | — |